2LV/2L1/2L2/2MS/2MT
1-5-26
(5) Detaching and refitting the high voltage PWB
Procedure
1. Remove the cassette.
2. Remove the right upper cover and the
right lower cover. (See page 1-5-4)
3. Remove the left upper cover and the left
lower cover. (See page 1-5-6)
4. Remove the power source fan motor.
(See page1-5-30)
5. Remove the power source PWB.
(See page1-5-25)
6. Stand the printer front side up.
7. Remove four screws each and then
remove the bottom plate 1 and the bot-
tom plate 2.
Figure 1-5-42
8. [60/50/45 ppm model only]
Release two hooks and then remove
the wire cover.
Pull the connector of lift sensor out.
Figure 1-5-43
Screw
Screw
Screw
Screw
Screw
Bottom plate 2
Screw
Screw
Screw
Bottom plate 1
Lift sensor
Hooks
Connector
Wire cover
Summary of Contents for P-4030D
Page 11: ...This page is intentionally left blank ...
Page 15: ...2LV 2L1 2L2 2MS 2MT This page is intentionally left blank ...
Page 25: ...2LV 2L1 2L2 2MS 2MT 1 1 10 This page is intentionally left blank ...
Page 63: ...2LV 2L1 2L2 2MS 2MT 1 3 24 This page is intentionally left blank ...
Page 99: ...2LV 2L1 2L2 2MS 2MT 1 4 36 This page is intentionally left blank ...
Page 130: ...2LV 2L1 2L2 2MS 2MT 1 5 32 This page is intentionally left blank ...
Page 147: ...2LV 2L1 2L2 2MS 2MT 2 1 14 This page is intentionally left blank ...
Page 175: ...2LV 2L1 2L2 2MS 2MT 2 3 20 This page is intentionally left blank ...
Page 200: ...Installation Guide 500 sheets paper feeder Installation Guide ...
Page 202: ...㟝㫴G㤵㣠 㟝㫴G㤵㣠 㦹㢨G㣰G㥐ᶤ 㦹㢨G㣰G㥐ᶤ ...
Page 203: ...2000 sheets bulk paper feeder Installation Guide ...
Page 205: ...1 2 3 4 1 2 3 1mm 용지 적재 용지 적재 PF 315 종이 잼 제거 종이 잼 제거 양면 장치 양면 장치 ...
Page 206: ...SSD HD 6 Installation Guide ...
Page 207: ......
Page 208: ......
Page 209: ...IEEE1284 Interface Installation Guide ...
Page 212: ...Network interface Installation Guide ...
Page 215: ......
Page 216: ...OS ...