2LV/2L1/2L2/2MS/2MT-2
1-2-2
1-2-2 Unpacking and installation
Figure 1-2-2
Caution: Place the machine on a level surface.
Unpacking
9
1
3
4
7
12
10
8
5
6
13
2
11
1. Outer case
2. Inner case
3. Bottom pad R
4. Bottom pad L
5. Machine cover (740 × 700)
6. Machine
7. Upper pad R
8. Upper pad L
9. Top tray
10. Operation guide
11. Operation sheets Assy *1
12. Waste toner bottle
13. Power cord
*1: Except 240V model
Summary of Contents for P-4030D
Page 11: ...This page is intentionally left blank ...
Page 15: ...2LV 2L1 2L2 2MS 2MT This page is intentionally left blank ...
Page 25: ...2LV 2L1 2L2 2MS 2MT 1 1 10 This page is intentionally left blank ...
Page 63: ...2LV 2L1 2L2 2MS 2MT 1 3 24 This page is intentionally left blank ...
Page 99: ...2LV 2L1 2L2 2MS 2MT 1 4 36 This page is intentionally left blank ...
Page 130: ...2LV 2L1 2L2 2MS 2MT 1 5 32 This page is intentionally left blank ...
Page 147: ...2LV 2L1 2L2 2MS 2MT 2 1 14 This page is intentionally left blank ...
Page 175: ...2LV 2L1 2L2 2MS 2MT 2 3 20 This page is intentionally left blank ...
Page 200: ...Installation Guide 500 sheets paper feeder Installation Guide ...
Page 202: ...㟝㫴G㤵㣠 㟝㫴G㤵㣠 㦹㢨G㣰G㥐ᶤ 㦹㢨G㣰G㥐ᶤ ...
Page 203: ...2000 sheets bulk paper feeder Installation Guide ...
Page 205: ...1 2 3 4 1 2 3 1mm 용지 적재 용지 적재 PF 315 종이 잼 제거 종이 잼 제거 양면 장치 양면 장치 ...
Page 206: ...SSD HD 6 Installation Guide ...
Page 207: ......
Page 208: ......
Page 209: ...IEEE1284 Interface Installation Guide ...
Page 212: ...Network interface Installation Guide ...
Page 215: ......
Page 216: ...OS ...