background image

8

NOTES

Date of Installation:

Boiler Model #:

Installed By:

Utica Boilers

2210 Dwyer Avenue, Utica NY 13504-4729

Phone: (315) 797-1310 • Fax: (866) 432-7329

e-mail: info@ecrinternational.com

web site: www.ecrinternational.com

Summary of Contents for DV

Page 1: ...the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier Do not use this boiler if any part has been under water Immediately call a qualified service technician to inspect the boiler and to replace any part of the control system and any gas control which has ...

Page 2: ...TICE Indicates information which should be followed to ensure proper installation and operation WARNING Indicates a hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a hazardous situation which if not avoided may result in minor or moderate injury Utica Boilers recommends all boiler maintenance be performed by a trained heating technician Before any...

Page 3: ...a qualified service technician Force or attempted repair may result in a fire or explosion Do not use this appliance if any part has been under D water Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water E F Operating Instructions For Intermittent Pilot System STOP 1 Read the safety in...

Page 4: ...accumulated in the system Check the entire piping system and if any leaks appear have them repaired Figure 2 Circulator Many circulators like the one pictured in Figure 2 above require periodic servicing Motor usually has openings at each end to lubricate bearings Put about one half teaspoon of SAE 20 or 30 non detergent motor oil in each opening twice a year CAUTION Do Not Over Oil Many circulato...

Page 5: ...once a 7 month during heating season with few drops of non detergent motor oil SAE 20 or 30 Do not over oil Place sheet of heavy paper or similar material in 8 bottom of combustion chamber and brush down flue passageways Soot and scale will collect on paper and is easily removed with paper Visual check of main burner and pilot flames should be made at start of heating season and again in mid seaso...

Page 6: ... Orifices GAS VALVE ORIFICES BURNERS Figure 5 Boiler Front with Safety Switch COMBUSTION BURNER REMOVED BURNERS GAS VENT PIPE CHAMBER DOOR VALVE ADAPTER ROLL OUT SAFETY BURNER SWITCH JACKET FRONT PANEL Figure 7 Burners Pilot Flame IGNITION ELECTRODE 3 8 TO 1 2 IN FLAME ...

Page 7: ...7 NOTES ...

Page 8: ...TES Date of Installation Boiler Model Installed By Utica Boilers 2210 Dwyer Avenue Utica NY 13504 4729 Phone 315 797 1310 Fax 866 432 7329 e mail info ecrinternational com web site www ecrinternational com ...

Reviews: