5
Installations must conform to requirements of
the authority having jurisdiction. Such applicable
requirements take precedence over the general
instructions of this manual.
Where required by the authority having jurisdiction,
the installation must conform to the American Society
of Mechanical Engineers Safety Code for Controls and
Safety Devices for Automatically Fired Boilers, ANSI/
ASME No. CSD-1.
LOCATE BOILERS in front of final position before
removing crate. Provide a level solid base as near
the chimney as possible, and centrally located with
respect to the heat distribution system as practical.
Allow 24 inches in the front and top for servicing
and cleaning, or removing tank-less water
heating coil.
When installed in utility room, door should be
wide enough to allow largest boiler part to enter,
or to permit replacement of another appliance
such as water heater.
Boiler must not be installed on carpeting or vinyl
flooring.
Minimum clearances to combustible construction are:
TOP .......................................... 24 IN.
FRONT
...................................... 24 IN.
FLUE CONNECTOR
........................ 9 IN.
REAR ..........................................
6 IN.
SIDES .........................................
6 IN.
NOTICE
Clearance for access should exceed fire
protection clearance.
REMOVE CRATE and plastic protective wrapper,
inspect for damage. All equipment is carefully
manufactured, inspected and packaged. Our
responsibility ceases upon delivery of crated boiler
to carrier in good condition. Any claims for damage
or shortage in shipment must be filed immediately
against the carrier by cosigner. Move boiler to
permanent position by sliding or walking.
!
WARNING
Improper installation, adjustment, alteration,
service or maintenance can cause personal
injury or loss of life.
!
WARNING
Boiler may not be installed on combustible
flooring.
INTRODUCTION