background image

Figure 6

11”

Attach the burner harness zip tie to right side jacket 

9. 

with the screw provided. See 

Figure 6

.

Attach the side jackets to the lower intermediate 

10. 

bracket at rear of boiler. See 

Figure 7

.

Figure 7

Place the rear insulation on the rear of the boiler.

11. 

Attach the lower rear. Insert the tabs into the slots 

12. 

provided. Do not attach the upper rear panel yet. (Pipe 

nipples removed for clarity)

Figure 8

You may now tighten down the control panel and side 

13. 

panel hardware. You may have to pull the front switch 

out in order to completely fasten the screws. (See 

Figure 9

.

Figure 9

Slot & Screw

Attach the top panel to the side panels.

14. 

3

KNOCKDOWN BOILER ASSEMBLY

Summary of Contents for TriFire

Page 1: ... Rear of Boiler P N 240007211 Rev B 06 08 KNOCKDOWN ASSEMBLY Instructions for TriFire Oil Fired Boiler SUPPLEMENTAL INSTRUCTIONS This assembly must be completed by a qualified installer or service agency in accordance with the manufacturer s instructions and in accordance with all codes and requirements of the authority having jurisdiction Failure to follow these instructions could result in fire ...

Page 2: ...rol panel on the top of the boiler with the burner wire harness on the right See Figure 5 Figure 5 Attach the control panel to the left side jacket The 7 slot on the front of the control panel will slide over the screw in the side jacket panel See Figure 5A Figure 5A Attach the right side jacket panel to the boiler and 8 control panel like the left side At the rear of the boiler be sure the panel ...

Page 3: ...n on the rear of the boiler 11 Attach the lower rear Insert the tabs into the slots 12 provided Do not attach the upper rear panel yet Pipe nipples removed for clarity Figure 8 You may now tighten down the control panel and side 13 panel hardware You may have to pull the front switch out in order to completely fasten the screws See Figure 9 Figure 9 Slot Screw Attach the top panel to the side pane...

Page 4: ...e 9 Figure 9 Attach the front panel by setting onto the rivets in the 16 side jackets See Figure 10 Figure 10 Proceed to the section Packaged Boiler Assembly in 17 the Installation Operation and Maintenance manual 4 KNOCKDOWN BOILER ASSEMBLY For technical assistance with this product call toll free 1 800 325 5479 ECR International PO Box 4729 Utica NY 13504 4729 www ecrinternational com ...

Reviews: