The Utile Engineering Co. Ltd.
28/07/04
Irthlingborough, Northamptonshire. England
Tel: +44 (0) 1933 650216
Fax: +44 (0) 1933 652738
6
IC101
Handling
Skilled personnel working in accordance with safe working practices
must carry out the lifting of machines. Before lifting the correct
equipment must be available. Cranes, jacks, slings, and lifting beams
must be capable of carrying the weight of the machine to be lifted. The
lifting eyebolt situated in the top of the cylinder and a crane hook must
be used when lifting or moving the machine (see fig 3). Do not use the
machine ports or the shaft extension for lifting or moving the machine.
For weights see above in Technical Specification.
Installation
Utile Engineering trained personnel or those trained to an equivalent standard should carry out installation, any
claims for damage due to faulty installation will be void. The machine is delivered ready to be connected, with only
the removal of the intake and discharge protection covers. All warning labels and instructions must be observed
and retained with the machine. Before installation, ensure there is no damage to the machine and that it turns
freely by hand.
Typical tools required for installation include: -
Set of spanners
Pipe Wrenches
Set of screwdrivers
Hacksaw
Hammer / mallet
Typical bolt tightening torques are: -
Bolt Tightening Torques
Size
Torque
Size
Torque
M4
1.75 Nm
M12
50.00 Nm
M5
3.50 Nm
M16
100.00 Nm
M6
6.00 Nm
M20
150.00 Nm
M8
15.00 Nm
M24
250.00 Nm
M10
30.00 Nm
Location
The machine should be installed in a clean, dry, well-ventilated area. Allow adequate space and facilities for
service, inspection and future expansion. A minimum of 0.75m of working space around the machine is
recommended. Adequate space around the motor and machine, particularly any fan inlets, is also necessary to
facilitate cooling airflow. Where several machines are installed in close proximity, care must be taken to ensure
there is no recirculation of exhausted warm air.
Foundation
Simple slab type foundations, designed for static loadings only are satisfactory. The foundations should raise the
machine to a reasonable height above the floor for convenient service and inspection. The use of anti-vibration
mounts between the base and foundation are recommended, these absorb the vibrations generated by the rotating
parts of the machine and insulate it against any vibration in the surrounding environment. Ensure that the anti-
vibration mounts are evenly loaded. Foundation bolts should fix the base.
Electrical Supply and Connection
The voltage rating of the supply must be compatible with the motor and the fittings. All electrical installation must be
carried out by a qualified electrician and in accordance with current regulations and within the framework of the
Electricity of Work Regulation 1990. Ensure all electrical connections, plugs, sockets etc are secure before
switching the supply on.
Earthing
It is important that the motor enclosure is soundly earthed by metallic earth continuity conductor, or by separate
earth bonding, but in all cases the installation must be made and tested and approved for this feature by a qualified
installer before the supply is applied to the motor.
Handling
Installation
Fig. 3