background image

Issue 1.03

 

V-GREAT GLOBAL CORPORATION

VG-6653 Conventional Manual Call Point 

Installation  and  Operation  Manual  V1.03 

Features 

Alarming by pressing, reset by a special key

Plug-in structure

Designed to comply with EN 54-11

Description 

VG-6653 Innovation Manual Call Point (MCP) is 
non-addressable. It alarms by the current caused by 
pressing the action plate. It can be simply connected to 
compatible conventional fire alarm system from various 
manufacturers. This MCP is suitable for public places. 
When there is fire, pressing the action plate on this MCP 
can send alarm signal to compatible conventional fire 
alarm control panel.

 

Installation 

The conduit can be surface mounted or flush mounted. 
Surface mounting: 
First  install  the  back  box  onto  the  wall  using  4  screws,  then 
install  the  base  onto  the  back  box.  Connect  cables  to 
corresponding  terminals  as  Fig.4.  Hook  the  juts  of  the  MCP 
body  to  the  base,  and  then  press  the  part  below  the  action 
plate  to  combine  them  completely.  Fig.  1  shows  surface 
mounting. 

Flush mounting: 

Install  the  base  onto  the  back  box.  Then  combine  the 
enclosure  and  base  the  same  as  surface  mounting.    Fig. 
2shows flush mounting. 

Fig. 1 

Fig. 2 

Application 

Application of the MCP is shown in Fig. 3 & Fig.4

Output-

Compatible Fire Alarm 
Control Panel

Alarm Zone

O-

O+

I-

I+

To the next device

MCP

Fig. 3 

Output-

Compatible Fire Alarm 
Control Panel

Alarm Zone

O-

O+

I-

I+

4.7k

Ω

E O L
R esistor

D etectors

or D evices

Fig.4 

Note

If MCP is at end of detection zoon ,EOL 

Resistor:4.7kΩ should be connected across terminals 3.O- 

and 4.O+.when connected with V-GREAT Control Panel 

series. 

Usage of the key

Vertically  insert  the  key  into  the  key-hole,  then  push  it  with 
force and turn it clockwise. Turn the key back and pull it out 
when the action plate is rebounded. 

Usage of the test tool

The test tool is used to keep continuity during commissioning
or maintenance when MCP is not installed, so that cable test
can be carried out easily and make the circuit completed.

ERTIF

IC

AT

I

O

N

B

OA

RD

LO

SS

PR

E

V

E

NT

IO

N C

LPCB

19

2831-CPR-F1545

1174d/01

Reviews: