2
4
8a
5a
7a
7b
1
3
24
24
9
8b
5b
This chapter refers to the figures on pages 09-11/32 .
Read the following instructions carefully before any operation:
Put on heavy working shoes and working gloves.
Lay the coupling on a solid and stable surface.
Remove the castellated nut (3), rear flange (4), rubber buffer (8a) and
the coupling flange (7a).
For drawbar couplings E503, E504 and E505 remove the second
rear flange (5a).
For drawbar couplings E506, E509 and E510 remove the
reinforcement plate (7b).
2 INSTALLATION
REV. F
CHAP. 2
PAG.
09/32
N
O
T
E
Installation has to be carried out by skilled personnel
DRAWBAR COUPLING E 50
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS