GPRS CONNECTION(OPTIONAL)
Inverter provides a GPRS(radio frequency) interface which control the switch time of a
designated load via an exteral Smart Plug (purchase the product from supplier if needed.)
so that the load mostly consumes PV energy and incurs the lowest-possible energy costs
during operation.
INVERTER MANIPULATION
Start inverter after checking all below steps:
1. Ensure the inverter fixed well on the wall.
2. Make sure all the DC wirings and AC wirings are completed.
3. Make sure the meter is connected well.
4. Make sure the battery is connected well.
5. Make sure the external EPS contactor is connected well. (if needed)
6. Turn on the AC switch and EPS switch
7. Turn on the PV/DC switch and battery switch.
GPRS CONNECTION STEPS
Please refer to the Smart Plug user manual for detailed connection steps.
Please connect to the port below
Grid
METER
AC
EMITTER
Could
com
Summary of Contents for VT-6608303
Page 33: ...8 1 7 Grid connected output 8 1 8 Inverter output 8 1 9 Load 8 1 10 Power...
Page 34: ...8 1 11 Power 8 1 12 Temperature 8 1 13 Status information 8 1 14 Error information...
Page 36: ...8 2 Setting 8 2 1 System setting...
Page 37: ......
Page 38: ......
Page 39: ...8 2 2 BAT Setting...
Page 40: ......
Page 41: ...8 2 3 Grid standard...
Page 42: ...8 2 4 System setting...
Page 43: ......
Page 44: ......
Page 45: ...8 2 5 485 Address 8 2 6 485 Baud rate 8 2 7 Language...
Page 46: ...8 2 8 LCD backlight 8 2 9 Date time 8 2 10 Clear history...
Page 47: ...8 2 11 Password Setting 8 2 12 Maintenance 8 2 13 Factory reset 8 2 14 Inquiry...
Page 48: ......
Page 49: ...8 2 12 Statistics...
Page 50: ......
Page 52: ......
Page 53: ......
Page 54: ......