32
OEM TM-50 User’s Guide
Preparing to Run a Job
61685321.fm
Preparing to Run a Job
The
Quick Setup Guide
below provides a brief outline of the setup steps to get seasoned opera-
tors up and running quickly. Detailed, step-by-step instructions follow in the sections ahead.
Quick Setup Guide
1.
Connect power and air supply.
2.
Check to ensure foot switch, peripheral cable, and optional vision, sensor and communica-
tion ports are connected.
3.
Turn the OEM TM-50 Controller ON.
4.
Load carrier tape.
5.
Load cover tape.
6.
Load an empty take-up reel.
7.
Select Heat or PSA Seal.
8.
Setup the Sealer.
9.
Perform a Seal Test.
10.
Perform a Peel Force Test.
11.
Set Tape Advance speed.
12.
Create the Trailer.
13.
Check the Carrier Tape Alignment.
14.
Set the Counter.
15.
Run the job.
Caution!
V-TEK® Incorporated takes no responsibility for the safety of the OEM TM-50 if it is
used for any purpose other than the intended purpose as specified in this User’s
Guide.
Summary of Contents for OEM TM-50 SMD
Page 2: ......
Page 4: ......
Page 10: ...Safety Warning Labels 61685113 fm vi ...
Page 28: ...16 OEM TM 50 User s Guide Machine Overview 61685225 fm ...
Page 43: ...6174007 fm Using the Vision Port Chapter 2 Controller 29 Vision Hookup Example Figure 2 33 ...
Page 74: ...60 OEM TM 50 User s Guide Electrical Connections 6174322 fm Figure 4 6 ...
Page 95: ...61004015 fm Appendix A Sensors A 1 Appendix A Sensors ...
Page 102: ...Service and Parts Contacts 61053915 fm Page 2 ...
Page 104: ......
Page 106: ...TM 50 OEM Sensors Spare Parts List D219368 2 fm Page 1 of 1 ...
Page 108: ......
Page 110: ......
Page 111: ......