6-10
TM-403 User’s Guide
Preparing to Run a Pre-programmed Job
D292105.8b.fm
3.
Press
Move To Pick
, then press
Pick Part.
Observe the
vacuum sensor which is located on top of the head to
see if it is set correctly for the current part. The numbers
should be lit in
green
with components on the nozzle
and
red
if components are not.
Note:
See the
Chapter 6: Troubleshooting
for vacuum
sensor adjustment procedures.
4.
Return to the
Head Setup Tab
.Press
Move To Place
, then press
Place Part.
Check that the
Blow Off Pressure
is set correctly for the
current part.
The
Blow-off Pressure
Gauge
is located on
the front of the
Pick Head Bridge
. If components are not
dropping properly, pull the gauge out and rotate to adjust
pressure levels. When the desired pressure level is
reached, push the gauge back in.
Setup Vision
The TM-402 Vision System will automatically revert to the previous inspection. If the
same part is being run, there is no need to retrain the camera. Proceed to Step 8. If a dif-
ferent job/inspection is being run, follow the setup instructions in
Chapter 4: Setup
.
Step 7:
Setup
Vision