Installation instructions
Heat pump dryer
Multi-family building
J173.113-0
6.4.11 ITH
5
Washer-dryer tower
➤
Refer to the identification plate for specifications for the required mains voltage, current type and fuses.
➤
Application height of the appliance: up to max. 2000 m above sea level
3. Connecting the condensate drain
When installing the drain hose, protect it against damage and bending!
To ensure proper drainage, do not extend the drain hose.
➤
Install plastic hose supplied (length
2,0 m, ø internal 10 mm) on drain
connection of the appliance and
secure using clamp supplied.
➤
Feed plastic hose in sink drain trap or
drain hose.
Electrical connections
Electrical connections must made by trained electricians in accordance with the guidelines and standards for low voltage
installations and the specifications of the local electricity supply companies.
A plug-in appliance may only be connected to a socket outlet with earthing contact, installed according to specifications. An
all-pole mains isolating device with 3 mm contact opening should be provided in the house wiring system. Switches, plug and
socket devices, circuit breakers and fusible cut-outs which are accessible after installation and which have all-poles switching
are permissible as isolating devices. Effective earthing and separately installed neutral and earth conductors ensure safe and
fault-free operation. After installation, live parts and cables with basic insulation must not be accessible. Old installations should
always be checked.
Connection cable
Error message «U1»
Colour code
400 V 3N~ 50 Hz, 10 A
Disconnect the appliance from the
mains and control the connections.
L3
L2
L1
grey
black
brown
blue
yellow/green
E42
: Check the neutral conductor!
E43
: Check the pole conductors L2 and L3!
max. 1200 min. 800
min. 250
Drain into fixed
upright outflow pipe
Connection to
sink drain trap
Set W5.3070
max. 700
N
L3
L2
L1
5 × 1 mm
2
N