background image

E

N

G

L

IS

H

IMPORTANT REMARKS

For any installation problem please contact our Customer Service
at the 39-0172.812411 operating Monday to Friday
from 8:30 to 12:30 and from 14:00 to 18:00.

V2 has the right to modify the product without previous
notice; it also declines any responsibility to damage or
injury to people or things caused by improper use or
wrong installation.

Please read this instruction manual very carefully 

before installing and programming your control unit.

• This instruction manual is only for qualified technicians, who 

specialize in installations and automations.

• The contents of this instruction manual do not concern the 

end user.

• Every programming and/or every maintenance service should 

be done only by qualified technicians.

AUTOMATION MUST BE IMPLEMENTED IN COMPLIANCE
WITH THE EUROPEAN REGULATIONS IN FORCE:

EN 60204-1

(Machinery safety electrical equipment of 
machines, part 1: general rules)

EN 12445

(Safe use of automated locking devices, test 
methods)

EN 12453

(Safe use of automated locking devices, 
requirements)

• The installer must provide for a device (es. magnetotermical 

switch) ensuring the omnipolar sectioning of the equipment 
from the power supply.
The standards require a separation of the contacts of at 
least 3 mm in each pole (EN 60335-1).

• The plastic case has an IP55 insulation; to connect flexible 

or rigid pipes, use pipefittings having the same insulation 
level. 

• Installation requires mechanical and electrical skills, 

therefore it shall be carried out by qualified personnel only,
who can issue the Compliance Certificate concerning the 
whole installation (Machine Directive 98/37/EEC, Annex IIA).

• The automated vehicular gates shall comply with the 

following rules: EN 12453, EN 12445, EN 12978 as well as 
any local rule in force. 

• Also the automation upstream electric system shall comply 

with the laws and rules in force and be carried out 
workmanlike.

• The door thrust force adjustment shall be measured by 

means of a proper tool and adjusted according to the max. 
limits, which EN 12453 allows.

• We recommend to make use of an emergency button, to be 

installed by the automation (connected to the control unit 
STOP input) so that the gate may be immediately stopped 
in case of danger.

• The appliance is not to be used by children or persons with 

reduced physical, sensory or mental capabilities, or lack of 
experience and knowledge, unless they have been given 
supervision or instruction.

• Children being supervised do not play with the appliance.

• For correct installation of the system, we recommend 

following the instructions issued by UNAC very carefully, 
which can be consulted at the following web site: 
www.v2home.com

DECLARATION OF CONFORMITY

The following statement is applicable only if the below listed
equipments are employed in accordance with the purpose indica-
ted in the instruction manual. 

Company:

Contact person:

V2 SPA

Cosimo De Falco

Corso Principi di Piemonte 65

Chief Executive Officer

12035 RACCONIGI -ITALY
Tel. +39 01 72 82 10 11
Fax +39 01 72 82 10 50

V2 SPA declares that the series of BLITZ actuators are in
conformity with the provisions of the following EC directives:

73/23/EEC

low voltage directive

89/366/CEE

electromagnetic compatibility directive

98/37/EEC

machine directive

Note: Declares that the above mentioned devices may not be
operated until the machine (automated gate) is identified, CE-
labeled, and declared to be compliant to the specifications of
Directive 89/392/EEC and following modifications.

The person in charge for the machine start-up must provide the
following records:

• Technical specification paper
• Declaration of conformity
• CE-labeling
• Testing record
• Maintenance record
• Operation manual and directions

Racconigi 20/10/2009
V2 SPA legal representative

Cosimo De Falco

7

Summary of Contents for BLITZ-120V

Page 1: ...SIBLE DE BRAZO ARTICULADO PARA CANCELAS BATIENTES MOTORREDUTOR ELECTROMEC NICO IRREVERS VEL COM BRA O ARTICULADO PARA PORT ES DE BATENTE ELEKTROMECHANISCHER IRREVERSIBLER STELLANTRIEB MIT GELENKARM F...

Page 2: ......

Page 3: ...e automation upstream electric system shall comply with the laws and rules in force and be carried out workmanlike The door thrust force adjustment shall be measured by means of a proper tool and adju...

Page 4: ...rking temperature C 30 60 30 60 30 60 Thermal protection C 140 140 140 Working cycle 80 20 20 Motor weight Kg 14 6 14 6 14 6 INSTALLATION LAYOUT 1 BLITZ actuator cable 4 x 1 mm2 cable 1 5 x 2 mm2 Blit...

Page 5: ...pansion from 7 to 8 mm min Your gate has to be equipped with central stop 1 and possibly side limits 2 INSTALLATION MEASURES To carry out a proper installation of the operator parts as well as to ensu...

Page 6: ...t and fasten the screw Release the ratiomotor see paragraph EMERGENCY LOCK RELEASE Mark the front bracket fastening points on the door according to the previous established levels Separate the front b...

Page 7: ...204 1 BLITZ 24V ADJUSTMENT OF STOP ENDS Opening stop end release the actuator and put the door into its opening position Adjust the cam LOWER for the RIGHT motor and UPPER for the LEFT motor until the...

Page 8: ...directly from the motor Insert the key supplied in the lock perform 1 2 of a turn Open the door and turn the release lever to position 2 Turn again the release lever to position 1 close the door turn...

Page 9: ......

Reviews: