E
N
G
L
IS
H
9
PRELIMINARY OPERATIONS
The new series of actuadors BLITZ, has been devised to serve gates up to 800 Kg with leaf up to 3 meters wide (look at the table technical
data). Before proceeding with the installation, please make sure that your gate opens and closes freely, and that:
• Pintles and pivots shall be in good order and properly lubricated
• Nothing shall block the movement
• No friction with earth and between the doors shall exist (mechanical expansion from 7 to 8 mm min.)
• Your gate has to be equipped with central stop (1) and possibly side limits (2)
INSTALLATION MEASURES
To carry out a proper installation of the operator parts as well as to ensure the best automation performance, the measurement levels
shown in the following table shall be complied with. Change the gate structure to adapt it to one of the cases in the table, if necessary.
γγ
B [mm]
A [mm]
C [mm]
90°
20 ÷ 40
140
650
50 ÷ 80
140
650
90 ÷ 140
150
650
150 ÷ 160
160
650
170 ÷ 180
180
650
180 ÷ 220
180
650
220 ÷ 250
180
600
250 ÷ 320
200
600
100°
20 ÷ 60
170
650
70 ÷ 110
180
650
110 ÷ 150
190
650
150 ÷ 200
200
650
110°
20 ÷ 50
180
650
50 ÷ 100
200
650
110 ÷ 130
210
650