background image

ZIS483
IL 509-1
EDIZ. 19/03/2019

TORQ

I

ATTUATORE ELETTROMECCANICO 

IRREVERSIBILE 230V PER CANCELLI 

SCORREVOLI FINO A 800 KG 

DI PESO

GB

230V ELECTRO-MECHANICAL 

IRREVERSIBLE RACK ACTUATOR 

FOR SLIDING GATES UP TO 800 KG

F

OPERATEUR ELECTROMECANIQUE 

IRREVERSIBLE 230V POUR PORTAILS 

COULISSANTS JUSQU’A 800 KG 

DE POIDS

E

MOTOR ELECTROMECANICO 

IRREVERSIBLES 230V PARA PUERTAS 

CORREDERAS HASTA 800 KG 

DE PESO

Summary of Contents for TORQ500A-230V

Page 1: ...ORREVOLI FINO A 800 KG DI PESO GB 230V ELECTRO MECHANICAL IRREVERSIBLE RACK ACTUATOR FOR SLIDING GATES UP TO 800 KG F OPERATEUR ELECTROMECANIQUE IRREVERSIBLE 230V POUR PORTAILS COULISSANTS JUSQU A 800...

Page 2: ...300 3 325 88 5 88 5 161 177 70 325 5 150 185...

Page 3: ...THE AUTOMATION MOVEMENT 8 2 PROGRAMMING OF THE WIDTH OF THE PEDESTRIAN OPENING 8 3 ADVANCED PROGRAMMING OF THE AUTOMATION MOVEMENT 9 LED SIGNALLING 9 1 INPUT STATUS SIGNALLING LEDS 9 2 ERROR SIGNALLI...

Page 4: ...make any modifications to any part of the automation device or the accessories connected to it unless described in this manual Any other modifications will void the warranty on the product The instal...

Page 5: ...are authorised for use and closure is not in a public area Examples of this type are gates inside business premises where the sole users are employees or a part of them who have been suitably informed...

Page 6: ...nigi CN Italy Under its sole responsibility hereby declares that the partly completed machinery model s TORQ500A 230V TORQ800A 230V Description electromechanical actuator for sliding gates is intended...

Page 7: ...t for the complete setting of the concrete 6 Unscrew the bolts fixing the base to the clamps and put the motor on the plate 7 Insert the 4 grains with their nuts in the proper place Adjust the 4 grain...

Page 8: ...TOR Check the following points 1 the motor must be on a levelled surface and perfectly parallel to the gate 2 the distance between pinion and rack must be 1 or 2 mm If needed adjust the 4 grains 3 the...

Page 9: ...r working of the system we suggest to weld the end of stroke brackets on the rack 3 5 MOTOR OVERRIDING SYSTEM mATTENTION before operating the manual release disconnect the power The motor is anyway di...

Page 10: ...ONAL ACCESSORIES LENGTH OF THE CABLE 10 metres from 10 to 20 metres from 20 to 30 metres Power supply 230V 120V 3G x 1 5 mm2 3G x 1 5 mm2 3G x 2 5 mm2 Photocells TX 2 x 0 5 mm2 2 x 0 5 mm2 2 x 0 5 mm2...

Page 11: ...immer clockwise increases the pause time from 0 to 180 seconds Please note the AUTO dip switch must be put to ON DELAY NOT USED mVarying the POWER trimmer has no effect until the stroke is reprogramme...

Page 12: ...230Vac max 15W AUX AUX contact electric lock PH 01 Photocell safety edge Normally closed contact PH 02 Photocell safety edge Normally closed contact GND Common of the PH01 PH02 terminals VA Rated powe...

Page 13: ...the gate open they have no effect 6 5 GATE OPEN PILOT LIGHT If the photo test which is deactivated by default see Paragraph 11 1 is not used it is possible to connect a gate status pilot light to the...

Page 14: ...of all the transmitters that you want to program the red radio LED flashes and the green start LED stays on steady 4 Press the SET and RADIO buttons simultaneously or wait 10 seconds to exit the proce...

Page 15: ...Position the door in the fully closed position 2 Press the SET button for 2 seconds the yellow set LED flashes 3 Press the START button for 1 second the yellow set LED lights up steadily 4 Press the S...

Page 16: ...lashes when a command is received through King Gates transmitter is off when the control unit is in standby mode 9 2 ERROR SIGNALLING LEDS RED ERROR LED The red error LED signals any errors that hampe...

Page 17: ...is function the AUX output must be set to courtesy light see Paragraph 10 2 1 Press the RADIO button for 1 second the red radio LED lights up steadily 2 Press the SET button for 1 second the yellow se...

Page 18: ...seconds to exit the procedure the LEDs return to the normal operating configuration 11 SAFETY DEVICE ADVANCED PROGRAMMING SEQUENCES These programming sequences are not essential to the system s operat...

Page 19: ...SET and RADIO buttons simultaneously or wait 10 seconds to exit the procedure the LEDs return to the normal operating configuration mIn order to carry out the check on the safety devices the connecte...

Page 20: ...ramming sequences and the settings adjustable through the dip switches To perform a new programming sequence or make a dip switch trimmer modification effective the protection must be deactivated 1 Pr...

Page 21: ...throughout the entire manoeuvre If there are multiple photocell pairs these may signal false obstacles Try bridging the PHO1 PHO2 and STOP contacts to verify whether the problem can be resolved Otherw...

Page 22: ...self as well as to human health As indicated by the symbol opposite throwing away this product as domestic waste is strictly forbidden So dispose of it as differentiated waste in accordance with your...

Page 23: ...t this period may vary depending on the intensity of use Any inspection maintenance or repairs should only be performed by qualified personnel Even if you think you know how do not modify the system a...

Page 24: ...V2 S p A Corso Principi di Piemonte 65 67 12035 RACCONIGI CN ITALY Tel 39 0172 812411 Fax 39 0172 84050 info v2home com www v2home com...

Reviews: