Provide appropriate protective measures to allow for the
possibility of failure and
malfunction
. The protective mea-
sures must also allow for the requirements of the respec-
tive application.
Pumps with AC motor:
In case of overload, the motor is shut down by a
self-hold
thermal cutout
in the winding.
Note
: Only manual reset is possible. Switch off the pump
and disconnect from the power source. Identify and elimi-
nate the cause of failure. Wait approx. five minutes before
restarting the pump.
•
Note
: In case of
supply voltage below 100V
, the lock
of the cutout might be impaired and the pump may
restart on its own after sufficient cooling down. Take
appropriate precautions, if an automatic restart of the
pump may lead to a dangerous situation (e.g., switch
off the pump and disconnect from the power source).
Pumps with DC motor:
A temperature sensor at the circuit board protects the mo-
tor of pumps with 24V DC motor. In case of excess tem-
perature, the pump is switched off.
Note
: Only manual reset is possible. Disconnect the pump
from the power source. Identify and eliminate the cause of
failure.
Maintenance and repair
In order to comply with laws (occupational, health and
safety regulations, safety at work law and regulations for
environmental protection) vacuum pumps, components
and measuring instruments can only be returned when
certain procedures (see section „Repair - Maintenance -
Return - Calibration“, pg. 62) are followed.
Take advantage of our service seminars, which put special
focus on the maintenance and repair of vacuum pumps.
NOTICE
Summary of Contents for MD 1
Page 27: ...page 27 of 72 MD 1 MD 1 C US pump with dual voltage motor 4 9 8 7 5 6 3 2 1 2 1 2 1 ...
Page 28: ...page 28 of 72 MD 1 VARIO SP Ensure sufficient venting of the pump 9 5 6 7 10 ...
Page 53: ...page 53 of 72 1 2 1 2 3 15 mm 4 6x size 2 2x 1 ...
Page 54: ...page 54 of 72 4 5 6 20696264 Clean ...
Page 55: ...page 55 of 72 Replacing the diaphragm 7 8 9 1 2 ...
Page 56: ...page 56 of 72 3 10 11 12 Pay attention to number of washers ...
Page 57: ...page 57 of 72 13 14 15 1 2 Pay attention to number of washers ...
Page 58: ...page 58 of 72 Replacing the valves and assembling the pump heads 16 17 18 4x ...
Page 60: ...page 60 of 72 22 23 16 15 24 1 2 Maintain all pump heads in the same way 15 16 mm size 2 2x ...