Repair
-
Maintenance
-
Return
-
Calibration
Every employer (user) is held responsible for the health
and safety of his employees. This also applies to service
personnel performing repair, maintenance, return or cali-
bration.
The
health and safety clearance form
informs the con-
tractor about any possible contamination of the device and
forms the basis for the risk assessment.
In case of devices which have been in contact with
biological substances of risk level 2 contact the
VACUUBRAND service absolutely before dispatch-
ing the device. These devices have to be completely
disassembled and decontaminated by the user prior
to shipment. Do not return devices which have been
in contact biological substances of risk level 3 or
4.
These devices cannot be checked, maintained or re-
paired. Also decontaminated devices must not returned to
VACUUBRAND due to a residual risk.
The same conditions apply to on-site work.
No repair, maintenance, return or calibration is possi-
ble unless the correctly completed health and safety
clearance form is returned. Devices sent are rejected
if applicable.
Send a completed copy of the
health and
safety clearance form
to us in advance. The declaration
must arrive before the equipment. Enclose a second com-
pleted copy with the product.
Remove all components from the device that are no origi-
nal VACUUBRAND components. VACUUBRAND will not
be responsible for lost or damaged components that are
no original components.
Drain the device completely of fluids and residues.
Decontaminate the device.
Close all openings airtight
especially if using substances hazardous to health.
To expedite repair and to reduce costs, please enclose a
detailed description of the problem and the product’s op-
erating conditions with every product returned.
IMPORTANT
Summary of Contents for MD 1
Page 27: ...page 27 of 72 MD 1 MD 1 C US pump with dual voltage motor 4 9 8 7 5 6 3 2 1 2 1 2 1 ...
Page 28: ...page 28 of 72 MD 1 VARIO SP Ensure sufficient venting of the pump 9 5 6 7 10 ...
Page 53: ...page 53 of 72 1 2 1 2 3 15 mm 4 6x size 2 2x 1 ...
Page 54: ...page 54 of 72 4 5 6 20696264 Clean ...
Page 55: ...page 55 of 72 Replacing the diaphragm 7 8 9 1 2 ...
Page 56: ...page 56 of 72 3 10 11 12 Pay attention to number of washers ...
Page 57: ...page 57 of 72 13 14 15 1 2 Pay attention to number of washers ...
Page 58: ...page 58 of 72 Replacing the valves and assembling the pump heads 16 17 18 4x ...
Page 60: ...page 60 of 72 22 23 16 15 24 1 2 Maintain all pump heads in the same way 15 16 mm size 2 2x ...