44
20901544_E12C+16C_NT Vsel_V1.2_260922
Commissioning (operation)
5.3
5.3
Shutdown (switch off)
Shutdown (switch off)
Take the pump out of operation
1.
Stop the process and let the diaphragm pump run on for
about 30 minutes, with open gas ballast or open inlet.
5
Condensate and media residues will be flushed out of the
vacuum pump.
IMPORTANT!
>
Prevent deposits and rinse condensate out of
the pump.
4
(a)
2.
Switch rocker switch
(a)
off – switch position
O
.
5
Pump switched off.
3.
Disconnect the pump from the apparatus.
4.
Check the pump for dirt and damage.
Switch pump off