4.2
Checking the seed feed
Figure 4.2
The seed feed should be checked at the same time as the sowing depth, i.e. after every 4 hectares
or once an hour.
In connection with output verification, check that both sides of the machine appear to be outputing
the same amount from each coulter. Raise the machine to the low-lift position. Then engage the
full-lift position.
Manually turn the drive wheel one full turn when the fan is not running (for safety reasons). Then
start the fan and check that the seed has been blown out. If you are not sure whether the seed has
blown out, repeat this procedure.
Start with tramlining activated and with all coulters except those switched off for tramlining de-
livering seed. Then advance past the tramlining function and check if these coulters are now de-
livering seed.
To check that both sides of the drill are delivering equal amounts of seed, the calibration test which
is normally carried out on one of the seed housings should now be done on both, see
bration, mechanical feed output” on page 37.
If the two sides of the drill are delivering different amounts of seed, check that there is no damage
to either of the seed housings. If there is no damage, then the seed housings can be given differing
scale settings to even up the actual seed feed.
Summary of Contents for RAPID RDA S Series
Page 1: ...Ver 2 01 11 2002 900225 en Instructions Seed drill RAPID series RDA 500 800 S No 12 000 12 799...
Page 2: ...2 Ver 2 01 11 2002...
Page 4: ...4...
Page 73: ...RDA 500 800 S Ver 2 01 11 2002 73...
Page 75: ...RDA 500 800 S Ver 2 01 11 2002 75 Figure 5 4...
Page 105: ...RDA 500 800 S Ver 2 01 11 2002 105...
Page 108: ...Appendices 108 Ver 2 01 11 2002 7 3 2 Hydraulic diagram RDA 800 S Figure 7 2 428718...
Page 121: ......