background image

6

7

Notes:

Installation

Before installing your new mixer, flush 

through the pipe work to ensure removal 

of debris, turn off the water supply.
Place the base ring onto the bottom of the 

mixer make sure the O-ring is in place in 

the underside of the base ring.
Position the mixer on the basin. From 

the underside of the basin screw the 

two flexible pipes to the hot and cold 

connections in the mixer body, the hot 

should be to the left and the cold to the 

right, hand tighten only. 
Screw the threaded rod into the small 

hole inside the mixer body.
Slide the rubber/metal washer over the 

rod, the rubber washer should be on top. 

Screw on the nut and tighten to clamp the 

mixer to the basin.   

CAUTION:

 Do not over tighten the nut as 

this may damage the basin.
Connect the water supply to the inlet 

pipes. The hot water should be connected 

to the left pipe and cold to the right.

CAUTION:

 When 

installing the 

flexible hoses 

do 

not

 kink, or bend  

them more than the 

60mm diameter as 

shown right.

60mm

Control 

handle

O-ring

Base ring

Rubber/ 

metal 

washer

Nut

Hot flexible  

pipe (red)

Cold flexible  

pipe (blue)

Threaded 

rod

Reviews: