6
7
Notes:
Installation
Before installing your new mixer, flush
through the pipe work to ensure removal
of debris, turn off the water supply.
Place the base ring onto the bottom of the
mixer make sure the O-ring is in place in
the underside of the base ring.
Position the mixer on the basin. From
the underside of the basin screw the
two flexible pipes to the hot and cold
connections in the mixer body, the hot
should be to the left and the cold to the
right, hand tighten only.
Screw the threaded rod into the small
hole inside the mixer body.
Slide the rubber/metal washer over the
rod, the rubber washer should be on top.
Screw on the nut and tighten to clamp the
mixer to the basin.
CAUTION:
Do not over tighten the nut as
this may damage the basin.
Connect the water supply to the inlet
pipes. The hot water should be connected
to the left pipe and cold to the right.
CAUTION:
When
installing the
flexible hoses
do
not
kink, or bend
them more than the
60mm diameter as
shown right.
60mm
Control
handle
O-ring
Base ring
Rubber/
metal
washer
Nut
Hot flexible
pipe (red)
Cold flexible
pipe (blue)
Threaded
rod