10
7
4
5
6
x 2
1
2
Installation - Quick guide
Installation
Note:
Make sure that the valve is
positioned to allow room for the riser
rail to be fitted later (see dimensions on
page 6).
Prepare the wall with 2 copper pipes
at 150mm centres, making sure both
pipes are level. Connect the water
supply to the inlet pipes. The hot water
should be connected to the left hand
pipe.
Wall plugs
150mm
Screws
Warning!
Please check for any
hidden cables and pipes before drilling
holes in the wall.
Remove the nut and olive from the
connector.
Drill the 4 marked holes to a suitable
depth for the wall plugs and secure with
supplied screws. Repeat for the other
connector.
Position the valve making sure it is
level. From below mark the position of
each connector. Remove the valve, and
the connectors. Place the connector
back onto the wall and mark the 4
screw holes in each connector.
Temporarily screw both quick fit
connectors onto the valve.