171
20 WARRANTY CONDITIONS
1. Without prejudice to the restrictions stated hereinafter, the contractor guarantees both the
soundness of the product delivered by him and the quality of the material used and/or delivered
for it, insofar as this concerns faults in the product delivered which do not become apparent
during inspection or transfer test, which the principal shall demonstrate to have arisen within 12
months from delivery in accordance with sub article 1A exclusively or predominantly as a direct
consequence of unsoundness of the construction used by the contractor or as a consequence of
faulty finishing or the use of poor materials.
1A. The product shall be deemed to have been delivered when it is ready for inspection (if
inspection at the premises of the contractor has been agreed) and otherwise when it is ready
for shipment.
2. Articles 1 and 1A shall equally apply to faults which do not become apparent during inspection
or transfer test which are caused exclusively or predominantly by unsound assembly/installation
by the contractor. If assembly/installation is carried out by the contractor, the guarantee period
intended in article 1 shall last 12 months from the day on which assembly/installation is
completed by the contractor, with the understanding that in this case the guarantee period shall
end not later than 18 months after delivery in accordance with the terms of sub article 1A.
3. Defects covered by the guarantee intended under articles 1, 1A and 2 shall be remedied by the
contractor by repair or replacement of the faulty component either on or off the premises of the
contractor, or by shipment of a replacement component, this remaining at the discretion of the
contractor. Sub article 3A shall equally apply if repair or replacement takes place at the site
where the product has been assembled/installed. All costs accruing above the single obligation
described in the first sentence, such as are not restricted to shipment costs, travelling and
accommodation costs or disassembly or assembly costs insofar as they are not covered by the
agreement, shall be paid by the principal.
3A. If repair or replacement takes place at the site where the product has been
assembled/installed, the principal shall ensure, at his own expense and risk, that:
a. the employees of the contractor shall be able to commence their work as soon as they
have arrived at the erection site and continue to do so during normal working hours, and
moreover, if the contractor deems it necessary, outside the normal working hours, with
the proviso that the contractor informs the principal of this in good time;
b. suitable accommodation and/or all facilities required in accordance with government
regulations, the agreement and common usage, shall be available for the employees of
the contractor;
c. the access roads to the erection site shall be suitable for the transport required;
d. the allocated site shall be suitable for storage and assembly; the necessary lockable
storage sites for materials, tools and other goods shall be available;
e. the necessary and usual auxiliary workmen, auxiliary machines, auxiliary tools, materials
and working materials (including process liquids, oils and greases, cleaning and other
minor materials, gas, water, electricity, steam, compressed air, heating, lighting, etc.) and
the measurement and testing equipment usual for in the business operations of the
principal, shall be available at the correct place and at the disposal of the contractor at
the correct time and without charge;
f. all necessary safety and precautionary measures shall have been taken and adhered to,
and all measures shall have been taken and adhered to necessary to observe the
applicable government regulations in the context of assembly/installation;
g. the products shipped shall be available at the correct site at the commencement of and
during assembly.
Summary of Contents for OILCON MARK 6M
Page 112: ...111...
Page 113: ...112...
Page 114: ...113...
Page 115: ...114...
Page 116: ...115...
Page 117: ...116...
Page 118: ...117...
Page 119: ...118...
Page 120: ...119...
Page 121: ...120...
Page 122: ...121...
Page 123: ...122...
Page 124: ...123...
Page 125: ...124...
Page 128: ...127 Drawing 1 0806 0005 Sheet 1 2...
Page 129: ...128 Drawing 2 0806 0005 Sheet 2 2...
Page 130: ...129 Drawing 3 0806 1041...
Page 131: ...130 Drawing 4 0806 1075...
Page 132: ...131 Drawing 5 0806 1076...
Page 133: ...132 Drawing 6 0806 1077...
Page 134: ...133 Drawing 7 0806 1260 Sheet 1 2...
Page 135: ...134 Drawing 8 0806 1260 Sheet 2 2...
Page 136: ...135 Drawing 9 0806 1265...
Page 137: ...136 Drawing 10 0806 1267...
Page 138: ...137 Drawing 11 0806 1268...
Page 139: ...138 Drawing 12 0806 1279...
Page 140: ...139 Drawing 13 0806 1285...
Page 141: ...140 Drawing 14 0806 1286...
Page 142: ...141 Drawing 15 0806 1287...
Page 143: ...142 Drawing 16 0806 1288...
Page 144: ...143 Drawing 17 0806 1621...
Page 145: ...144 Drawing 18 0806 1622...
Page 146: ...145 Drawing 19 0806 2032...
Page 147: ...146 Drawing 20 0806 2048...
Page 148: ...147 Drawing 21 0806 2050...
Page 149: ...148 Drawing 22 0806 5019...
Page 150: ...149 Drawing 23 0806 5026...
Page 151: ...150 Drawing 24 0806 8016...
Page 152: ...151 Drawing 25 0806 8023...
Page 153: ...152 Drawing 26 0806 8035...
Page 154: ...153 Drawing 27 0806 8038 Sheet 1 4...
Page 155: ...154 Drawing 28 0806 8038 Sheet 2 4...
Page 156: ...155 Drawing 29 0806 8038 Sheet 3 4...
Page 157: ...156 Drawing 30 0806 8038 Sheet 4 4...
Page 158: ...157 Drawing 31 0806 8039...
Page 159: ...158 Drawing 32 0806 8040...
Page 160: ...159 Drawing 33 0806 8070...
Page 161: ...160 Drawing 34 0810 2010...
Page 162: ...161 Drawing 35 0871 1213...
Page 163: ...162 Drawing 36 0899 1092...
Page 164: ...163 Drawing 37 0899 1163...
Page 165: ...164 Drawing 38 0899 1249...
Page 166: ...165 Drawing 39 0899 1256...
Page 167: ...166 Drawing 40 0899 1258...
Page 168: ...167 Drawing 41 0899 1259...