background image

 

 

 

Unscrew  the  seat  (4)  from  the  cage  (3)  being 
careful not to lose the renewable seat (9) unless 
it

’s  being  replaced.    Remove  the  plug  (5)  with 

connector  (7)  attached  and  the  bushing  (6).  
Note:  Bushing  is  only  supplied  in  older  valves 
with ductile iron cage. 
 
Unscrew  the  connector  (7)  from  the  plug  (5).  It 
may  be  necessary  to  apply  heat  as  these  parts 
are secured with Loctite. 
 
Remove  the  float  screw  (13),  lock  washer  (18) 
and  float  hood  (17)  from  the  float  ball  (12).  
Apply heat if necessary. 
 
Inspect  all  parts  for  wear  and  damage.    Minor 
scratches  and  dents  in  the  float  are  normal.  
Some floats may contain sand for added weight 
but  if  water  is  detected  replace  the  float.  
Carefully  clean  the  orifice  of  scale.  Replace 
damaged parts. 
 

REASSEMBLY 

Clean  all  parts  especially  seating  and  sealing 
surfaces before reassembling valve.  Worn parts 
should be replaced during re-assembly. 
 
Apply  Loctite  263  to  threads  on  one  end  of 
connector  (7),  install  in  plug  (5)  and  tighten.  
Install bushing (if needed) in cage.   
 
Lubricate  and  install  renewable  seat  (9)  in  plug 
and drop plug into cage (3).  Install seat (4) over 
the plug stem, thread into cage and tighten. 
 
Apply  Loctite  263  to  exposed  threads  on 
connector  (7),  screw  on  the  float  ball  (12)  and 
tighten.    
 
Lubricate and place seat O-ring (10) in seat (4), 
install in cover (2) and tighten.   
 
Ensure  mechanism  operates  freely  when  float 
ball is lifted and allowed to drop. 
 
Apply Loctite 380 to threads on  float screw (13) 
and install float screw, lock washer (18) and float 
hood (17) on bottom of float ball (12). 
 
Lubricate  cover  O-ring  (13)  in  cover  (2)  and 
install  on  body  (1)  ensuring  O-ring  is  retained.  
Install  the  cover  bolts  (11)  and  tighten  in  an 
alternating pattern.   
 
Carefully  introduce  pressure  and  check  for 
leaks.  

BACKFLUSHING INSTRUCTIONS 
 

Follow all local cross-connection and safety 

codes and regulations! 

 
To determine if a GA Industries sewage air valve 
needs cleaning or backflushing: 

  Close  the  inlet  isolating  valve  then  slowly 

open the ½” flushing ball valve (if installed) 
or  slowly  remove  the  pipe  plug  at  the  top 
of air valve to relieve internal pressure.  

 

Open the 1” blow off ball valve (if installed) 
or  remove  the  pipe  plug  near  the  bottom.  
Liquid  should  freely  drain  from  the  valve 
body.  If it does not, then the valve is likely 
in need of cleaning or backflushing. 

 
To  clean  a  GA  Industries  sewage  air  release 
valve equipped with backflushing attachments:  

  Close  the  inlet  isolating  valve  and  then 

slowly  open 

the  ½”  flushing  valve  to 

relieve internal pressure. 

  Open the 

1” blow off valve 

 

Connect  the  ½”  flushing  valve  to  a 
pressurized  source  of  clean  water  using 
the  rubber  hose  provided  with  the 
backflushing attachments.  

  Introduce  flushing  water  until  liquid  runs 

freely from the blow off valve. 

  Shut  off  and  disconnect  the  supply  of 

clean  water  and  close  the  blow  off  and 
flushing valves. 

 

  Slowly open the inlet isolating valve.  The 

air  release  valve  should  exhaust  air  and 
then close tightly

 

 
REPLACEMENT PARTS  

Genuine  replacement  parts  are  available  from 
your  local  VAG/GA  Industries  representative  or 
from the factory: 
 
VAG USA, LLC 
234 Clay Avenue 
Mars, PA 16046 USA 
Telephone: 724-776-1020 
Fax: 724-776-1254 
E-mail

quotes-ga@vag-group.com

 

 
Please have the nameplate data available when 
ordering parts.  

 

 

 
 
 

Summary of Contents for GA Industries FIGURE 939

Page 1: ...uction 2 Description of Operation 2 Receiving Storage 2 Installation 2 Valve Construction 3 Preventive Maintenance 3 Testing Trouble Shooting 3 Disassembly 3 Assembly 4 Backflushing Instructions 4 Order Replacement Parts 4 Repair Kits 5 Warranty 5 Figure 939 Drawing Parts List 5 234 Clay Avenue Mars PA 16046 USA Telephone 724 776 1020 Fax 724 776 1254 E mail info ga vag group com ...

Page 2: ...the ground without dropping The valves should remain in a clean dry and weather protected area until installed For long term storage greater than 6 months the rubber surfaces of the seat should be coated with a non toxic lubricant such as SuperLube made by Synco Chemical Do not expose the rubber parts to sunlight or ozone INSTALLATION The Figure 939 is standard with 2 or 3 NPT screwed pipeline con...

Page 3: ...e The float should drop as the water leaves the valve NOTE A manual valve can be installed in place of the pipe plug to facilitate testing valves are included with backflushing attachments Replace or tighten the pipe plug and slowly open the inlet isolating valve After expelling air the valve should close and seal tightly TROUBLESHOOTING Valve Does Not Close Fluid Leakage Verify debris has not col...

Page 4: ... Lubricate cover O ring 13 in cover 2 and install on body 1 ensuring O ring is retained Install the cover bolts 11 and tighten in an alternating pattern Carefully introduce pressure and check for leaks BACKFLUSHING INSTRUCTIONS Follow all local cross connection and safety codes and regulations To determine if a GA Industries sewage air valve needs cleaning or backflushing Close the inlet isolating...

Page 5: ...ubber 9 Renewable Seat Buna N Rubber 10 Seat O Ring Buna N Rubber 11 Cover Bolt Zinc Plated Steel 12 Float Ball 316 Stainless Steel 13 Float Screw Nylon 14 Pipe Plug Steel 15 1 Pipe Plug Cast Iron 16 2 Pipe Plug Cast Iron 17 Float Hood 316 Stainless Steel 18 Lock Washer 410 Stainless Steel REPAIR KITS Soft Goods Kit A939 Part Number 2 80 1000 023 contains Items 8 9 and 10 Other parts are ordered i...

Page 6: ...6 This page intentionally left blank ...

Reviews: