COMMISSIONING
67
Step 1
Prerequisites:
Clean and tidy workplace.
Required tools:
⚒
Hexagon socket
Assembly instructions:
1. Loosen the screws at the joint connector using a
hexagon socket wrench
Step 2
Assembly instructions:
1. Pull the two conductor system parts apart and re-
move the connection terminals.
Step 3
Assembly instructions:
1. Connect the connection terminals to the screw
terminals. At this stage only tighten the screws by
hand.
Schritt 4
Assembly instructions:
1. Insert the screw terminals with connection cable
back into the conductor system and push them
into the cover caps.
Summary of Contents for VCL Series
Page 95: ...INDEX 93 U Unloading 88...
Page 96: ...CE Technical Documentation...