COMMISSIONING
56
Mounting conductor system and adjusting connection joint
Install the conductor system straight and parallel to the crane runway.
The conductor system must be attached to each section with at least two hangers (support bracket or HRL
support profile).
Support bracket
Required tools:
⚒
Screwdriver for countersunk screw M6
Assembly steps:
1. Attach the hanger to the support brackets by clip-
ping or screwing (M6).
Remove the hanger by unscrewing it with a wrench
(SW13).
Step 1 HRL support profile
Assembly steps:
1. Place the hanger in the bore hole provided in the
support profile.
NOTICE!
Subsequent assembly applies both to the support
brackets and to the HRL support profiles.
►
The WCS laminate code rail mount (1) must al-
ways be at the top when arranged sideways.
Step 2
Assembly steps:
1. Insert the conductor system section into the
hanger from the front and then snap it into place.
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...