COMMISSIONING
66
NOTICE!
►
Observe the markings for right (R) and left (L).
Step 3
Assembly steps:
1. Tighten the cable gland until it is sealed against
the connecting cable.
Step 4
Required tools:
⚒
Screwdriver
Assembly steps:
1. Replace the cover and close the connection box.
Step 5
Assembly steps:
1. Place the cover cap on the feed terminal.
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...