COMMISSIONING
74
6.5.6
Condition after the installation
DANGER!
An adequate grounding as per IEC 60204-1/ 60204-32 must be ensured after
the installation of the profile!
WARNING!
The responsible assembly manager must check the
system for the following
parts or situations after assembly and issue and sign an acceptance certificate!
►
Check the general functionality of the system.
►
Clearances of the line transitions and transfers.
►
Open spaces and interfering edges.
►
Random sample checking of tightening torques.
►
Correct connection and routing of the cables.
►
Check of the feed terminals and their wirings.
►
Have all required parts been installed safely and
according to instructions.
►
Current collector units.
6.5.7
Installation completion
After completing the assembly work, the plant is to be checked for functionality.
NOTICE!
►
After the HRL support profile has been installed, proper grounding has to be ensured.
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...