COMMISSIONING
53
6.2
Operation/Decommissioning
6.2.1
Operation
Operation is understood to be trouble-free, normal operation. Check intervals as per the maintenance sched-
ule in Chapter: „8 “. If defects occur, stop using the conductor rail immediately to prevent damage.
6.2.2
Decommissioning
Switch off the system and secure it against restarting. Disconnect the entire power supply from the system
physically.
6.3
Assembly prerequisites
NOTICE!
Ensure that the following requirements are fulfilled before assembling the system:
►
Protective measures have to taken against unauthorized access and operation during the installation
work.
►
The foundation must be designed for the required static and dynamic load.
►
The interfaces as described in 4.5 Interfaces need to be prepared.
►
The installation site must be clean and free of all objects.
►
There has to be adequate lighting over the entire installation site.
►
Tools for proper assembly of the system have to be available (see 6.4 Assembly tools).
Information on installation
Before installation, observe the system-specific installation plan and the applicable system documentation.
• Align the conductor rails and funnels in such a way that the long bar is aligned with the crane runway.
• If specified in the system-specific installation plan, always install curved sections of the conductor system
first.
• The hanger spacings are listed in the system-specific installation plan.
• When attaching to the brackets, the sliding hangers may not jam so that the conductor system can move
freely.
Observe the following installation distances:
Maximum hanger spacing, VKS
Distance [m]
in straight sections
1.2
in curved sections
0.6
Horizontal
0.6
Maximum hanger spacing, support profile:
Distance [m]
on shelf uprights
4.5
on auxiliary supports
4.0
on walls
3.0
Horizontal
3.0
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...