5 Installation
24
Installation manual 0020200969_04
A
B
1
2
4
3
Ø120
Ø100
A
Cold roof
B
Hot roof
1.
Determine the installation site for the roof duct.
2.
Insert the flat roof penetration collar
(2)
.
3.
Glue the flat roof penetration collar in place.
4.
Insert the roof duct
(1)
through the flat roof penetration
collar from above and push it down until it is flush.
5.
Align the roof duct vertically.
6.
Put the cover plate
(3)
on.
7.
Secure the roof duct to the roof construction using the
fixing bracket
(4)
.
8.
Connect the roof duct to the product using extensions,
elbows and, if required, a partition. If you do not insert
a partition, you must always install the 48 mm clamp
directly on the product.
9.
Alternatives 1 / 2
Conditions
: Roof duct with extension
▶
Install the extensions. (
→
Page 28)
▶
Install the 45° elbow. (
→
Page 31)
▶
Install the 87° elbow. (
→
Page 32)
▶
Install the sliding sleeve. (
→
Page 27)
▶
Connect all of the disconnection points with air
clamps. (
→
Page 37)
9.
Alternatives 2 / 2
Conditions
: Roof duct without extension
▶
Install the sliding sleeve. (
→
Page 27)
5.5.3
Installing the ridge tiles for the 60/100 mm
diameter roof duct
5.5.3.1 Scope of delivery for article number 303982
(black)
48
760
2
1
1
Ridge tile terminal,
black
2
48 mm air-pipe collar
5.5.3.2 Ridge roof duct
According to the specifications from the tile manufacturer, a
suitable ridge tile must be installed.
130
133
130
103
103
≥25
≥20
≤125°
Suitable ridge tiles are manufactured by:
Aspect East Anglia Limited
The Old Mill
East Harling
NORWICH
NR16 2QW
Website: www.aspectroofing.co.uk
Contact: Chris Haythorpe
General Manager
–
Tile Division
Tel: +44 (0) 1953 717777 Fax: +44 (0) 1953 717164