Installation and maintenance instructions ecoTEC plus 937 0020031552_06
13
Preliminary remarks for room sealed appliances
This appliance should only be installed in conjunction
with either a Vaillant flue system or an alternative
approved system (details of flue approval categories
can be found in the technical section of the installation
manual).
Install the flue system as detailed in the separate flue
installation instructions supplied with this boiler.
3.4 General
requirements
3.4.1 Preliminary
remarks
This appliance must only be installed and commissioned
by a competent person approved at the time by the
Health and Safety Executive. Please check with your
installer that he is able to carry-out all the necessary
works including official notification of the works to the
relevant body upon completion.
3.4.2 Related
documents
The installation of the appliance and any associated hot
water system must be in accordance with (but not lim-
ited to) the following; COSHH regulations, Gas Safety
(Installation and Use) Regulations 1998, Health and
Safety Document No. 635 (The Electricity at Work Regu-
lations 1989), BS7671 (IEE Wiring Regulations) and the
Water Supply (Water Fitting) Regulations 1999, or The
Water Bylaws 2000 (Scotland). It should also be in
accordance with the relevant requirements of the Local
Authority, Building Regulations, The Building Regula-
tions (Scotland), The Building Regulations (Northern Ire-
land) and the relevant recommendations of the follow-
ing British Standards:
BS 6700:
Services supplying water for domestic use
within buildings and their curtilages.
BS 6798:
Specification for installation of gas fired boil-
ers not exceeding 60 kW input.
BS 6891:
Specification for installation of low pressure
gas pipework up to 28 mm (R1) in domestic premises
(2nd family gas).
BS 7593:
Treatment of water in domestic hot water
central heating systems.
Institute of Gas Engineers Publication
IGE/UP/7/1998:
”Guide for gas installations in timber framed housing”
BS. 5482 Pt. 1
Domestic butane and propane gas burn-
ing installations.
IGE/UP1
Soundness testing and purging of industrial
and commercial gas installation.
IGE/UP2
Gas installation pipework, boosters and com-
pressors on industrial and commercial premises.
IGE/UP10
Installation of gas appliances in industrial and
commercial premises.
BS. 6644:
Installation of gas fired hot water boilers of
rated inputs between 60 kW and 2 MW (2nd and 3rd
family gases).
>
BS. 5449:
Forced circulation hot water central heating
systems for domestic premises. Note: only up to 45 kW.
BS. 6880:
Low temperature hot water heating systems
of output greater than 45 kW.
Part 1
Fundamental and design considerations.
Part 2 Selection of equipment.
Part 3 Installation, commissioning and maintenance.
BS. 4814:
Specification for: Expansion vessels using an
internal diaphragm, for sealed hot water heating sys-
tems.
BS. 5440:
Installation and maintenance of flues and
ventilation for gas appliances of rated input not exceed-
ing 70 kW net (1st, 2nd and 3rd family gases).
Part 1
Specification for installation of flues.
Part 2 Specification for installation and maintenance
of ventilation for gas appliances.
Safety 3
Summary of Contents for ecoTEC plus 937
Page 1: ...For the heating engineer Installation and maintenance instructions GB IE ecoTEC plus 937 VUI...
Page 74: ...74 Installation and maintenance instructions ecoTEC plus 937 0020031552_06...
Page 76: ...76 Installation and maintenance instructions ecoTEC plus 937 0020031552_06...
Page 77: ...Installation and maintenance instructions ecoTEC plus 937 0020031552_06 77...
Page 78: ......
Page 79: ......
Page 80: ...0020031552_06 GBIE 102010 Subject to alterations...