Contents
2
Installation and maintenance instructions ecoTEC plus 937 0020031552_06
Contents
1
Notes on the documentation
................................4
1.1
Documents also having validity ..............................4
1.2 Storing
documents
.....................................................4
1.3 Symbols
used
...............................................................4
1.4
Validity of the manual ...............................................4
1.5 Identification
plates
...................................................4
1.6 CE
label
.........................................................................4
1.7 Benchmark
................................................................... 5
1.8 Gas
Council
Number
.................................................. 5
2
Unit description, data and dimensions
............. 5
2.1 General
notes
.............................................................. 5
2.2 Technical
data
.............................................................6
2.3 Dimensions
................................................................... 7
2.4
Structure and functional elements ........................9
2.5 Functional
description
............................................. 10
3 Safety
...........................................................................11
3.1
Safety and warning information .............................11
3.1.1 Classification
of
warnings
........................................11
3.1.2 Structure
of
warnings
...............................................11
3.2 Intended
use
................................................................11
3.3 General
safety
instructions
.....................................12
3.4 General
requirements
...............................................13
3.4.1 Preliminary
remarks
.................................................13
3.4.2 Related
documents
...................................................13
4 General
requirements
.............................................14
4.1
Scope of supply and accessories ...........................14
4.2 Installation
location...................................................14
4.3 Gas
supply
...................................................................15
4.4
Flue pipe.......................................................................15
4.4.1
100 mm standard flue duct .....................................15
4.4.2
Optional 125 mm flue pipe .......................................16
4.5 Flue
termination
........................................................16
4.6 Air
supply
.....................................................................17
4.7 Electrical
connection
................................................17
4.8 System
requirements
...............................................18
4.8.1 Water
circulation
system
.........................................18
4.8.2
Filling and preparation of the heating system ...18
4.8.3 Pressure
relief
valve
.................................................19
4.8.4 Pressure
gauge
..........................................................19
4.8.5
Heating circuit expansion vessel ...........................19
4.8.6
Shift load storage tank expansion vessel.......... 20
4.9
Details for the pumps ............................................. 20
4.9.1 Circulation
pump
..................................................... 20
4.9.2
Shift load storage tank circulation pump .......... 20
4.10 System-Bypass
......................................................... 20
4.11 Venting
....................................................................... 20
4.12 Condensate
siphon
.................................................. 20
5
Sequence of operations during installation
....21
5.1 Transporting
the
appliance
.....................................21
5.2
Required minimum gaps/assembly clearances 23
5.2.1
Selecting the location for the shift load
storage tank and combination boiler ..................23
5.3 Unpacking
the
equipment
......................................23
5.4
Using the installation template ............................ 24
5.5 Flue
exit
...................................................................... 24
5.6
Installation of the flue gas system ...................... 24
5.7
Fitting the appliance hanging bracket ................25
5.8
Mounting the combination boiler .........................25
5.9
Removing the front case ........................................26
5.10
General instructions concerning the heating
system .........................................................................26
5.11 Gas
connection
..........................................................26
5.12
Connecting the hot and cold water .....................27
5.13
Connecting piping between the stratified
storage tank and the combi-heater .................... 28
5.14
Connecting the heating supply and return
lines ..............................................................................29
5.15
Installing the condensate drain line.................... 30
5.16
Connecting the drain pipe to the pressure
relief valve ...................................................................31
5.17
Connecting the drain hose to the pressure
relief valve of the stratified storage tank ...........31
5.18
Connecting the exhaust gas system to the
combi-heater ...............................................................31
5.19 Electrical
connection
...............................................32
5.19.1 General
requirements
..............................................32
5.19.2 Establishing the electrical connection for the
stratified storage tank ............................................32
5.19.3 Establishing the power supply ..............................33
5.19.4
Connection diagrams ................................................................34
5.20 Control
units
..............................................................37
5.20.1 Vaillant control units and accessories ................37
5.20.2 External electrical controllers
...............................37
5.20.3 Details for the connection of an external
timer to the terminal strip .....................................37
5.20.4 Optional plug-in timers by Vaillant ..................... 38
5.21 Thermostatic
radiator
valves
............................... 38
5.22 Frost
prevention
...................................................... 38
5.23 Heating
pump
........................................................... 38
5.24
Anti-cyclic "Economiser" control system .......... 38
5.25
Automatic pump spin control ............................... 38
6 Commissioning,
Part
I
...........................................39
6.1
Preparatory checks of the electrical system ....39
6.2 Gas
supply
..................................................................39
6.3 Cold
water
supply
.....................................................39
6.4
Filling and bleeding the heating system .............39
6.4.1
Checking the fill pressure in the heating
system .........................................................................39
6.4.2
Filling device for ecoTEC plus 937 ...................... 40
6.4.3
Filling the heating system for the first time ..... 40
Summary of Contents for ecoTEC plus 937
Page 1: ...For the heating engineer Installation and maintenance instructions GB IE ecoTEC plus 937 VUI...
Page 74: ...74 Installation and maintenance instructions ecoTEC plus 937 0020031552_06...
Page 76: ...76 Installation and maintenance instructions ecoTEC plus 937 0020031552_06...
Page 77: ...Installation and maintenance instructions ecoTEC plus 937 0020031552_06 77...
Page 78: ......
Page 79: ......
Page 80: ...0020031552_06 GBIE 102010 Subject to alterations...