Installation and maintenance instructions ecoTEC plus 937 0020031552_06
25
5.7
Fitting the appliance hanging bracket
1
3
2
Fig. 5.3 Shift load storage tank with hanging bracket
Fix the hanging bracket (
1
) to the wall using the plugs
and screws (
2
) provided with the appliance.
Lift the shift load storage tank out of the packaging
(see Section 5.1).
Lift the shift load storage tank (
3
) onto the wall so
that it is located slightly above the hanging bracket
(
1
).
Slowly lower the shift load storage tank onto the
hanging bracket so that the installation carrier on the
rear of the unit fully engages in the hanging bracket.
i
If the appliance is to be fitted in a timber
framed building ensure that the hanging
bracket is secured to a substantial part of the
timber frame capable of taking the full weight
of the appliance.
>
>
>
>
5.8
Mounting the combination boiler
2
1
Fig. 5.4 Mounting the combi boiler on the shift load storage
tank
Lift the combi boiler out of the packaging (see Sec-
tion 5.1).
Lift the combi boiler (
2
) onto the shift load storage
tank so that it is located slightly above the shift load
storage tank (
1
).
i
Lift the combi boiler at both sides of the base.
Lower the combi boiler slowly onto the hanging
bracket on the shift load storage tank so that the
installation carrier on the rear of the combi boiler
fully engages in the hanging bracket on the shift load
storage tank.
>
>
>
Sequence of operations during installation 5
Summary of Contents for ecoTEC plus 937
Page 1: ...For the heating engineer Installation and maintenance instructions GB IE ecoTEC plus 937 VUI...
Page 74: ...74 Installation and maintenance instructions ecoTEC plus 937 0020031552_06...
Page 76: ...76 Installation and maintenance instructions ecoTEC plus 937 0020031552_06...
Page 77: ...Installation and maintenance instructions ecoTEC plus 937 0020031552_06 77...
Page 78: ......
Page 79: ......
Page 80: ...0020031552_06 GBIE 102010 Subject to alterations...