17
Installation and maintenance manual atmoCRAFT
GB
11
2
Fig. 4.15 Inserting the temperature sensor into the immersion
sleeve
• Insert the temperature sensor into the lower
immersion sleeve (
1
) on the left of the boiler.
• Stick the enclosed identification plate (
2
) to the top
left of the intermediate wall.
1
2
3
4
5
Fig. 4.16 Inserting the temperature sensors into the immersion
sleeves
• To do this you must insert the immersion sensor for
STL (
1
, with capillary tube) and the temperature sensor
(
2
, connect red plug to the electronic box) and the
empty sleeve (
3
) into the bottom immersion sleeve.
• Place the clamping spring (
4
) between the immersion
sensors and push them, together with the sensors into
the immersion sleeve up to the stop.
• Lock everything in position using the clamping spring (
5
).
4.6
Fitting the burners
11
2
2
Fig. 4.17 Inserting the burners
• Insert four screws in the pockets in the end links.
• Place the burner (
1
) onto the screws (
2
).
Make sure that no items are lying on top of the
burner!
• Loosely screw the burner onto the screws using the
washers and hex nuts.
Fig. 4.18 Fitting the gas connection line
• Remove the dust protection from the gas fitting.
• Check that the O-ring for sealing the gas connection
line is securely located in the gas fitting.
• Push the pipe through to the back next to the boiler
and screw the connection flange to the gas fitting.
Above 130 kW the gas pipe must be pre-assembled
from the two pipes supplied.
Assembly 4
Summary of Contents for atmocraft
Page 1: ...VK 654 9 1654 9 atmoCRAFT DE AT GB...
Page 2: ......
Page 44: ...835553_02 DEATGB 092006...