Flat roof fitting and installation 5
0020077994_02 auroTHERM exclusive Installation manual
55
5.3
Completing and checking the installation
5.3.1
Checking installation
Use the following checklist to ensure that all work steps have been performed.
Operations
Yes
No
Comments
Building statics taken into account during installation of
the system
☐
☐
Clearances from the roof edge complied with in accord-
ance with the specifications
☐
☐
Rack positioned in accordance with the dimensions spe-
cifications
☐
☐
All bolts securely tightened
(Installation and telescopic rail)
☐
☐
Adequate ballast weights used
(Only for floating installation)
☐
☐
Load weights adequately secured against slipping and
tilting
(Only for floating installation)
☐
☐
Rack anchored and bolts tightened
(Only for direct connection)
☐
☐
All hydraulic connections tightened
☐
☐
Hydraulic connections routed correctly
☐
☐
VR 11
collector sensor connected
(Only for systems WITH a collector sensor)
☐
☐
Collectors connected to lightning protection device
(Optionally for lightning protection device)
☐
☐
Pressure testing performed
(Ideally with compressed air)
☐
☐
All connections tight
☐
☐
Date
Signature
All installation work has been
performed correctly.
ˍ ˍ
.
ˍ ˍ
.
ˍ ˍ ˍ ˍ