Instructions for Use, Installation and Servicing ecoMAX pro
24
13 Conversion
- Again in screen ‘8’, Set the appliance fan speed/burner
to minimum by pressing the ‘-‘ key until ‘1’ (burner to
Pmin) is shown on the right hand side of the screen.
Press the ‘mode’ button again.
- Check the CO2 value, which should be 10.5 % ± 0.2 %.
If adjustment proves necessary then proceed as
follows.
- Adjustment of the CO2 at minimum rate is very
coarse, so carefully adjust the CO2 with the (‘B’) offset
adjustment using a 2 mm allen key to 10.5 %, (rotate
clockwise to increase).
- After checking the combustion, press and hold the
‘mode’ button for 10 seconds to return to the normal
mode, showing the current flow temperature. Replace the
cap on the sampling point and refit the outer front case.
- Fit the LPG conversion label to the data badge.
- Re-commission boiler as described in the Installation
and Servicing Instructions supplied with boiler.
"A" throttle –
"Pmax" rotate
to increase
"B" offset adjustment
"Pmin" rotate
to increase
Fig 13.4
12705
Fig 13.5
12706
Appliance
CO2 content at nominal
load for LPG in vol. %
ecoMAX pro 28E
10.5 % ± 0.2 %
Summary of Contents for ecoMAX pro 18E
Page 37: ...Instructions for Use Installation and Servicing ecoMAX pro 37 Declaration of Conformity 17...
Page 38: ...Instructions for Use Installation and Servicing ecoMAX pro 38...
Page 39: ...Instructions for Use Installation and Servicing ecoMAX pro 39...
Page 40: ...0020005557_04 GB 08 2006 Subject to alteration...