INSTALLING THE AIR/FLUE DUCT SLIDING SLEEVE

Fig. 2.0:  Installing the sliding sleeve

1

2

3

1

2

4

5

6

7

Schiebemuffe_neu

INSTALLING THE
AIR/FLUE DUCT SLIDING
SLEEVE

NOTE:

For installations where there is in-
sufficient movement to allow fitting
of the flue into flue outlet, a slid-
ing sleeve (Accy. No. 303 915) is
available. When using the sliding
sleeve both the air and flue ducts
of the last extension must be
shortened by a further 95 mm.

• Push the sliding sleeve (

1

) over the

cut end of the flue duct (

2

).

• Place the air duct clamp (

7

) over

the air duct.

• Pull back the sliding sleeve so that

it engages into the socket (

3

) of

the boiler (

4

). Ensure that the

sliding sleeve penetrates the
socket such that there is at least
20 mm engagement at both ends
of the sliding sleeve.

• Fit the air duct clamp over the air

ducts (

5

and 

6

) of the

extension/terminal and boiler
outlet. Close the snap clamp.

• Drill two holes 3 mm diameter

through the air duct clamp (the
centre of the holes should be 6
mm from the edge of the clamp).
Ensure that the drill does not
penetrate the inner flue duct.
Screw the air duct clamp to the
air duct of the sleeve using the
screws provided.

• Complete the installation of the

flue as detailed in these
instructions.

Summary of Contents for ecoMAX pro 28 E

Page 1: ...aller Flue installation instructions Air flue duct for use with ecoMAX ecoMAX 613 2 E ecoMAX 618 2 E ecoMAX 622 2 E ecoMAX 824 2 E ecoMAX 828 2E ecoMAX 835 2E ecoMAX pro 18 E ecoMAX pro 28 E GB 200022...

Page 2: ...2...

Page 3: ...25 PART 1 Pages 4 20 Standard Concentric Systems 60 100 Aluminium air duct plastic flue duct PART 2 Pages 21 40 Optional Concentric System 80 125 Aluminium air duct plastic flue duct PART 2 CONCENTRIC...

Page 4: ...ons and standards Requirements Planning the air flue duct layout Regulations and standards to be observed 5 Alternative termination accessories available 6 Maximum flue lengths 9 Installation of the v...

Page 5: ...erson who is registered with CORGI The Council for Registered Gas Installers The installation of the boiler and flue must be in accordance with the Gas Safety Installation and Use Regulations 1998 and...

Page 6: ...ntric 970 mm 60 100 Air flue duct extensions concentric 1970 mm 60 100 Bends PP concentric pack of 2 45 60 100 Elbow concentric 87 60 100 Flue support clips pack of 5 100 Sliding sleeve PP 60 100 Adju...

Page 7: ...2 7 Fig 1 2 Elbow joints 60 100 Elbow 87 60 100 Vaillant Accy No 303 910 Bends 45 pack of 2 60 100 Vaillant Accy No 303 911 Air flue duct extension 470 mm 60 100 Vaillant Accy No 303 902 Air flue duct...

Page 8: ...4 33 56 Fig 1 5 Offset section 60 100 Offset section 60 100 Vaillant Accy No 303 919 303919_IAx Fig 1 8 Flat roof penetration collar GU_LAZ 42 0 Flat roof penetration collar Vaillant Accy No 009 056 F...

Page 9: ...87 828 2 E 835 2 E pro 18 E pro 28 E 10 0 m 7 0 m 10 0 m 8 0 m incl 1 elbow 87 4 0 m incl 1 elbow 87 10 0 m incl 1 elbow 87 824 2 E 9 0 m 7 0 m incl 1 elbow 87 613 2 E 618 2 E 622 2 E ecoMAX of which...

Page 10: ...he air duct clamp 7 over the air duct Pull back the sliding sleeve so that it engages into the socket 3 of the boiler 4 Ensure that the sliding sleeve penetrates the socket such that there is at least...

Page 11: ...w 1 x 70 mm air duct clamp 1 x 40 mm air duct clamp Internal trim ring 100 External wall seal See page 6 et seq for details of air flue duct elements Fig 3 0 Horizontal air flue conduit Important The...

Page 12: ...entreline of the template is vertical using a plumbline or spirit level Top outlet flue exiting to rear For installations where the air flue duct is to be installed directly to the rear of the boiler...

Page 13: ...important to remove any burrs with a file this ensures easy fitting of the ducts and prevents any rough edges from damaging the flue seals Care should be taken not to scratch the white surface of the...

Page 14: ...iler installation instructions Fit the elbow to the boiler by inserting the spigot of the flue elbow into the flue socket on the boiler and secure using the air duct clamp provided Pull the air flue d...

Page 15: ...ine the installation site for the boiler with reference to the installation and servicing instructions supplied with the boiler Ensure that all installation and service clearances are available and th...

Page 16: ...This permits easy separation between the air flue duct and the appliance Drill two holes 3 mm through the air duct of the flue boiler clamp at the most convienient holes on the air duct clamp Ensure t...

Page 17: ...e boiler See pages 19 et seq for further details on the installation of extensions and elbows Push the sliding sleeve 4 firmly into place on the extensionn Join the vertical roof duct 5 to the extensi...

Page 18: ...duit Lair length of air conduit Minimum length of air conduit extension 80 mm 1 2 13 2 70 L air Lexhaust 1 2 40 mm 27 1 Fig 9 1 Cutting tubes to size The seals are sensitive to mineral oil based greas...

Page 19: ...0 635 425 640 430 645 435 650 440 655 445 660 450 665 455 670 460 675 465 680 470 685 475 Table 10 1 Length of surplus with 87 elbows 190 to 210 mm 0 215 to not 265 mm possible 270 to 290 mm 80 295 85...

Page 20: ...420 mm Important This gives a corresponding exhaust conduit length of 284 40 324 mm cf page 19 GU_LAZ 103 2GB Fig 10 2 Installation of 45 bends 325 320 445 330 327 450 335 334 455 340 341 460 345 348...

Page 21: ...ments Planning the air flue duct layout Regulations and standards to be observed 22 Alternative termination accessories available 23 Maximum flue lengths 26 Changing the appliance connection piece 28...

Page 22: ...n instructions are observed The installation of the boiler and its flue must be carried out by a competent person who is registered with CORGI The Council for Registered Gas Installers The installatio...

Page 23: ...ct extensions PPs concentric 470 mm 80 125 303 202 x Air flue duct extensions PPs concentric 970 mm 80 125 303 203 x Air flue duct extensions PPs concentric 1970 mm 80 125 303 205 x Bends PPs concentr...

Page 24: ...ow PPs 87 80 125 Vaillant Accy No 303 210 Bends PPs 45 pack of 2 80 125 Vaillant Accy No 303 211 Air flue duct extension PPs 470 mm 80 125 Vaillant Accy No 303 202 Air flue duct extension PPs 970 mm 8...

Page 25: ...tched roof Adjustable roof tiles for pitched roof Vaillant Accy No 009 076 black GU_LAZ 41 0 164 120 Fig 1 5 Sliding sleeve 80 125 Sliding sleeve PPs 80 125 Vaillant Accy No 303 215 GU_LAZ 76 0 Fig 1...

Page 26: ...n exposed position Maximum length of flue is reduced by 2 0 m for each additional 90 elbow Maximum length of flue is reduced by 1 0 m for each additional 45 elbow Accessories Accy No Vertical flue sys...

Page 27: ...27 PART 2 CONCENTRIC 80 125 PLANNING THE AIR FLUE DUCT LAYOUT Maximum flue length Maximum flue length LAS Euro B S 074 0 LAS Euro B S 074 0 Fig 1 9 Fig 1 8...

Page 28: ...remove it Push the appliance connection piece with the selected connection diameter down from above inserting the push in end onto the sleeve of the flue collecting chamber Now push the appliance conn...

Page 29: ...Place the air duct clamp 7 over the air duct Pull back the sliding sleeve so that it engages into the socket 3 of the boiler 4 Ensure that the sliding sleeve penetrates the socket such that there is...

Page 30: ...rizontal air flue duct 87 elbow 2 x 70 mm air duct clamps 2 x internal trim rings 125 See page 24 et seq for details of air flue duct elements Fig 4 1 Horizontal air flue conduit GU_LAZ 82 0 Important...

Page 31: ...and flue termination are in accordance with these instructions prior to drilling any holes for the boiler hanging bracket Once the position of the flue exit hole has been determined the hole should b...

Page 32: ...and remove the 3 screws Separate the ducts Note For assembly reasons do not shorten any air duct to a length of less than 100 mm If necessary shorten two adjacent extensions to achieve the overall req...

Page 33: ...al assembly through the flue exit hole until it protrudes 220 mm out from the outside wall Ensure that the terminal is correctly positioned with the air inlet grille at the bottom Slide one of the two...

Page 34: ...bow 5 to the appliance connection piece Push the sliding sleeve 7 firmly into place on the appropriate extensionns 6 Install the extensions and join the clutch sleeve to the 87 elbow This section func...

Page 35: ...Preparation Determine the installation site for the boiler with reference to the installation and servicing instructions supplied with the boiler Ensure that all installation and service clearances a...

Page 36: ...ly into place on the extensionn Join the vertical roof duct 5 to the extension 7 Join the sliding sleeve 4 to the appliance s connection piece 8 This permits easy separation between the air flue duct...

Page 37: ...he boiler See pages 41 et seq for further details on the installation of extensions and elbows Push the sliding sleeve 4 firmly into place on the extensionn Join the vertical roof duct 5 to the extens...

Page 38: ...ue conduit Lair length of air conduit Minimum length of air conduit extension 100 mm 1 2 15 1 2 70 L air Lexhaust 1 2 40 mm 25 Fig 10 1 Cutting tubes to size The seals are sensitive to mineral oil bas...

Page 39: ...415 630 420 635 425 640 430 645 435 650 440 655 445 660 450 665 455 670 460 675 465 680 470 685 475 690 480 695 485 700 490 705 495 710 500 715 505 720 510 725 515 Table 11 1 Length of surplus with 9...

Page 40: ...t 284 mm and the height 420 mm Important This gives a corresponding exhaust conduit length of 284 40 324 mm cf page 41 GU_LAZ 103 2GB Fig 11 2 Installation of 45 bends 335 334 455 340 341 460 345 348...

Page 41: ...41...

Page 42: ...42...

Page 43: ...43...

Page 44: ...44 49 GB 03 08 2002 M Subject to alteration Head Office Service Solutions 0870 6060 777 Vaillant Ltd Vaillant House Technical Advice 01634 292392 Medway City Estate Trident Close Rochester Kent ME2 4...

Reviews: