Start-up 7
0020261188_00 ecoTEC plus Installation and maintenance instructions
21
7.3
Filling the heating installation
1.
Flush the heating installation thoroughly before filling it.
2.
Observe the information on treating heating water.
(
→
Page 19)
▽
If you cannot guarantee the conditions for treating
the heating water, install an external plate heat ex-
changer to protect the product.
4
3
2
1
3.
Open the plugs
(2)
and then connect the filling/draining
cock connection to a heating water supply in accord-
ance with the relevant standards.
4.
Open the heating water supply.
5.
Open all thermostatic radiator valves.
6.
If necessary, check that both service valves on the
product are open.
7.
Slowly open the filling/draining cock
(1)
so that the wa-
ter flows into the heating installation.
8.
Open the air separator
(3)
and wait until the water flows
out of the air separator without bubbles.
9.
Purge all of the radiators until the entire heating installa-
tion is filled with water.
10. Close all purging valves.
11. Use the manometer
(4)
to monitor the rising filling pres-
sure in the heating installation.
–
To optimise the purging, the pressure should be lim-
ited in such a way that it lies in the first third of the
grey display field on the manometer. Once the pur-
ging procedure is complete, the digital manometer
can be used to set the hydraulic pressure depend-
ing on the distribution network (required feed head,
multilevel installation, etc.).
12. Fill it with water until the required filling pressure is
reached.
Filling pressure
Recommended
filling pressure
Maximum filling
pressure
VC 406/5-5
(E-DE)
0.15 … 0.25 MPa
(1.50 … 2.50 bar)
< 0.40 MPa
(< 4.00 bar)
VC 406/5-5
(LL-DE)
0.15 … 0.25 MPa
(1.50 … 2.50 bar)
< 0.40 MPa
(< 4.00 bar)
VC 476/5-5
(E-DE)
0.15 … 0.25 MPa
(1.50 … 2.50 bar)
< 0.40 MPa
(< 4.00 bar)
VC 476/5-5
(LL-DE)
0.15 … 0.25 MPa
(1.50 … 2.50 bar)
< 0.40 MPa
(< 4.00 bar)
VC 636/5-5
(E-DE)
0.15 … 0.25 MPa
(1.50 … 2.50 bar)
< 0.40 MPa
(< 4.00 bar)
VC 636/5-5
(LL-DE)
0.15 … 0.25 MPa
(1.50 … 2.50 bar)
< 0.40 MPa
(< 4.00 bar)
13. Close the filling/draining cock and the heating water
supply.
14. Check all connections and the entire system for leaks.
Applicability:
VC 636/5-5 (E-DE)
OR VC 636/5-5 (LL-DE)
Caution.
Risk of damage to the product
▶
Protect all of the product's electrical
components before you use the air
separator.
▶
Check whether the air separator re-
mains leak-tight after it has been used.
▶
Use the air separator on the heat exchanger only if
problems occur with the filling.
7.4
Starting up the product
▶
Press the product's on/off button.
◁
The basic display appears on the display.
7.5
Running the installation assistants
The installation assistant is displayed whenever the product
is switched on until it has been successfully completed.
It provides direct access to the most important check
programmes and configuration settings for starting up the
product.
▶
Confirm the launch of the installation assistant.
◁
All heating demands are blocked whilst the installa-
tion assistant is active.
▶
To access the next item, confirm by pressing
Next
in
each case.
▽
If you do not confirm the launch of the installation
assistant, it is closed 10 seconds after you switch on
the unit and the basic display then appears.
7.5.1
Language
▶
Set the required language.
▶
Press
OK
twice to confirm the set language and to avoid
unintentionally changing it.
If you have unintentionally set a language that you do not
understand, proceed as follows to change it: