Installation
Installation instructions geoTHERM 0020051574_04
19
4
Item.
Number
Description
1
1
Heat pump
12
2
Installation instructions, operating
instructions
2
2
Left and right side parts
Together in one box:
3
1
Operating panel, cover column
5
1
6-litre brine expansion tank, max. 300 kPa
(3 bar)
Together in one large bag:
4
1
Clamp for fastening the brine expansion
tank
11
1
Expansion relief valve for brine circuit,
1/2", 300 kPa (3 bar)
6
1
VRC DCF radio clock signal receiver with
external sensor
7
4
VR 10 sensors
9
1
Control cable for vrnetDIALOG
10
1
Bag of small parts for fastening the brine
expansion tank
2
M6 flat-head screws for fitting the operat-
ing panel on the mounting plate
2
Tapping screws for the operating panel
mounting plate
4
Flat-head screws for fixing the side parts
to the frame
Together in one box:
8
4
Flexible connecting hoses (600 mm long,
heat source-side each with 1 1/2" inside
thread)
13
8
Bag with seals for connecting hoses for
the heating circuit (grey) and the brine/
well water circuit (yellow/green)
14
4
Lower and upper front cladding, front and
rear cover
4.3 Scope of delivery
4.6
Removing the transport locks
4.5 Removing the transport locks
>
Carefully remove the packaging and padding without
damaging the parts of the unit.
>
Remove the transport locks with which the heat pump is
fixed to the pallet.
>
Dispose of the transport locks correctly. These are no
longer required.