7.5 Fit combustion chamber cover
Carefully re-fit the combustion chamber cover to the
boiler ensuring it is correctly sealed. Secure cover with
retaining clamps.
7.6 Fit boiler casing
• Carefully push case (1) onto the boiler such that the
locating points either side at the top of the boiler
engage. Push the casing onto the securing clips at the
bottom of the boiler.
• Close control panel (2).
• Secure control panel by turning both securing fasten-
ers (3) clockwise by 90°.
Fig. 7.4: Fit boiler casing
1
I
0
I
0
90°
90°
3
2
833792_41GB_012005.qxd 09.03.2005 16:47 Uhr Seite 24
Summary of Contents for turboMAX pro 24/2 E
Page 39: ...833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 39...
Page 40: ...833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 40...
Page 41: ...833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 41...
Page 42: ...833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 42...
Page 43: ...833792_41GB_012005 qxd 09 03 2005 16 47 Uhr Seite 43...