Set-up 4
0020221303_02 uniSTOR HP Installation and maintenance instructions
7
4.3
Unpacking the product
1.
Remove the product from its box.
2.
Remove the protective film from all of the product's
components.
Caution.
Risk of material damage caused by un-
packing incorrectly.
The components could become damaged
when unpacking the product.
▶
Carefully unpack the product.
3.
Remove the product from its box.
4.
Remove the protective film from all of the product's
components.
4.4
Checking the scope of delivery
▶
Check that the scope of delivery is complete.
Quant-
ity
Designation
1
Domestic hot water cylinder
1
Enclosed documentation
1
Expansion vessel
4.5
Product dimensionsSlimline
Validity:
VIH RW GB 150 BES
Ø
435
172
523
797
452
A
B
C
Dimensions (mm)
A
B
C
VIH RW GB
150 BES
1,642
1,613
1,377
Summary of Contents for uniSTOR HP VIH RW GB BES Series
Page 23: ......