background image

4 Set-up

6

Installation and maintenance instructions uniSTOR 0020235300_03

3.4

Hot Water Association

Vaillant is a full member of the Hot Water Association and
promotes the scheme in association with its cylinder range.
Details are available on the web site www.vaillant.co.uk

4

Set-up

4.1

Observing the requirements for the
product's installation site

Caution.
Material damage due to frost

If the water in the system freezes, there is
a risk of damage to the domestic hot water
cylinder.

Install the cylinder in a dry, permanently
frost-free room.

Caution.
Material damage due to escaping water

In the event of damage, water may escape
from the cylinder.

Select the installation location so that, in
the event of damage, large volumes of
water can be drained safely (e.g. into a
floor drain).

Caution.
Material damage due to high load

When filled, the cylinder may damage the
ground on which it stands due to its weight.

Take into consideration the weight of the
filled cylinder and the load-bearing capa-
city of the floor.

If required, reinforce the installation area.

Select a sensible installation site and take into consideration
the routing of the pipework system.

Install the cylinder as close as possible to the heat generator
in order to minimise heat losses.

Set up the product in a suitable location in a room and, when
doing so, pay attention to the following points:

Plan the installation of the tundish .

The installation surface must be even and have sufficient
load-bearing capacity to support the operating weight of
the product.

The installation site must be frost-free.

Install the product in such a way that the thermostat and
immersion heater can be accessed easily.

Leave sufficient space around the product for installing,
maintaining and replacing the expansion vessel.

To prevent heat losses, the pipework system must have heat
insulation in accordance with the applicable energy-saving
regulations.

4.2

Transport

Caution.
Risk of material damage caused by incor-
rect transport.

The components attached to the cylinder
must not be used to transport the cylinder.
Otherwise there is a risk that the cylinder
could malfunction.

Do not use the components attached to
the cylinder to transport it.

Always transport the unit as illustrated above.

Never transport the unit while it is horizontal.

Summary of Contents for uniSTOR VIH SW GB 500 BES

Page 1: ...maintenance instructions uniSTOR VIH RW GB 500 BES VIH RW GB 800 BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de...

Page 2: ...m clearances and installation clearances 8 5 Installation 8 5 1 Installing the product 8 5 2 Hydraulic connection 8 5 3 Electrical installation 11 6 Start up 13 6 1 Setting the immersion heater thermo...

Page 3: ...tenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and main...

Page 4: ...rrect tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is tr...

Page 5: ...egu lations The Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Installers are required to carry out in...

Page 6: ...llation area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise hea...

Page 7: ...ant ity Description 1 1 Expansion vessel 2 1 Tundish with retainer 3 1 Safety group 4 1 Documentation records 5 1 Domestic hot water cylinder Not included in the product s scope of delivery but is ava...

Page 8: ...correct method of draining is not followed In certain circumstances and at the dis cretion of the installer install a WRAS ap proved automatic air vent on the hot water outlet at the highest point ON...

Page 9: ...a tions that have a floor standing boiler AUTO MAIN OPEN 4 Install the 2 port motorised valve at the heating coil s inlet or outlet 5 For the 2 port motorised valve follow the installation direction t...

Page 10: ...must increase the diameter of the line When installing the drain line comply with the standards directives and laws that are applicable in your country Size of the outlet valve Minimum diameter of th...

Page 11: ...f water drains onto access paths 5 2 6 Installing the temperature sensor for the immersion heater Note The temperature sensor is used to control the im mersion heater via a connection box or a control...

Page 12: ...1 SPDT relay 2 Switch for immersion heater 3 SPUR fuse 4 Immersion heater 1 Remove the cover for the electrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance...

Page 13: ...3 2 1 3 BLUE GREY GREEN ORANGE BROWN BROWN 1 Third party control 2 3 port motorised valve 2 port motorised valve 3 Heat generator Connect the assembly Condition Installation with a boiler 70 60 50 40...

Page 14: ...arts during maintenance or repair work this may void the conformity of the product and it will therefore no longer comply with the applicable standards We strongly recommend that you use original spar...

Page 15: ...ommissioning the product Switch off the heat generator Unplug the domestic hot water cylinder s mains plug Close the cold water stopcock Drain the product Page 14 Remove the hydraulic connections and...

Page 16: ...tat to 55 C 4 Replace the thermostat Irregular domestic hot water output at the valve 1 Defective expansion vessel 2 Thermal control 1 Set the expansion vessel 2 Interrupt the power supply of the prod...

Page 17: ...d pressure in the expan sion vessel 0 3 MPa 3 0 bar 0 3 MPa 3 0 bar Maximum temperature of the heating circuit 95 95 Maximum domestic hot water temperature 85 85 Heat loss 24 h energy effi ciency clas...

Page 18: ...sion heater to the power supply 230 V 50 Hz 230 V 50 Hz Immersion heater power 5 kW 7 5 kW Note Optional Low loss header 230 240 V 50Hz 230 240 V 50Hz Thermostat 230 240 V 50Hz 230 240 V 50Hz IP ratin...

Page 19: ...Appendix 0020235300_03 uniSTOR Installation and maintenance instructions 19 D Commissioning Checklist...

Page 20: ...UROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is t...

Page 21: ...Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comme...

Page 22: ...10 Documents 5 Drain valve 9 Draining the product 14 E Electricity 3 F Filling and purging the product 14 Frost 4 H Handing over to the end user 14 I Identification plate 5 Inspection work 14 16 Insta...

Page 23: ......

Page 24: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...