background image

Installation 5

0020235300_03 uniSTOR Installation and maintenance instructions

11

5.2.5.1 High-level drain

Installing the highest drain is permitted as long as this does
not present a danger to anyone in or outside the building at
the drain point. Examples of points to consider when decid-
ing whether a location is suitable for the highest drain:

The possibility (taking the wind into account) that a per-
son might stay in the area where the water is drained
for a prolonged period of time, and, if this is the case,
whether the water is sufficiently cooled by that point to
pose no danger. The thermal conductivity of the material
surfaces, the climatic conditions, the installation location
and the drain pipework direction can, to different extents,
contribute to reducing the temperature of the water that is
being drained.

The position of the windows and other openings.

The probability of prams being under the drain opening.

The resistance of the surface to hot water.

The possibility of ice forming if water drains onto access
paths.

5.2.6

Installing the temperature sensor for the
immersion heater

Note

The temperature sensor is used to control the im-
mersion heater via a connection box or a control.

Condition

: With connection box or control

Secure the temperature sensor.

5.2.7

Installing the destratification circuit

Read the section "Hydraulic connection" in order to install
the destratification circuit. (

Page 8)

5.2.8

Installing the thermostatic mixing valve

Install a thermostatic mixing valve on the domestic hot
water outlet if the basic system diagram requires this.

5.3

Electrical installation

Danger!
Risk of death from electric shock!

The power supply terminals L and N are live:

Switch off the power supply.

Secure the power supply against being
switched back on.

Caution.
Risk of material damage by drilling
through the product.

The product may be damaged by drilling
work.

Do not drill through the product.

70

60 50

40

70

60 50

40

1

3

2

4

1

3

2

4

1

2

3

4

1

Immersion heater

2

Immersion heater ther-
mostat

3

Primary circuit thermo-
stat

4

Retainer for additional
temperature sensor

5.3.1

Optional combination of thermostats

Use the wiring diagram in the system instructions for the
installation.

Summary of Contents for uniSTOR VIH SW GB 500 BES

Page 1: ...maintenance instructions uniSTOR VIH RW GB 500 BES VIH RW GB 800 BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de...

Page 2: ...m clearances and installation clearances 8 5 Installation 8 5 1 Installing the product 8 5 2 Hydraulic connection 8 5 3 Electrical installation 11 6 Start up 13 6 1 Setting the immersion heater thermo...

Page 3: ...tenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and main...

Page 4: ...rrect tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is tr...

Page 5: ...egu lations The Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Installers are required to carry out in...

Page 6: ...llation area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise hea...

Page 7: ...ant ity Description 1 1 Expansion vessel 2 1 Tundish with retainer 3 1 Safety group 4 1 Documentation records 5 1 Domestic hot water cylinder Not included in the product s scope of delivery but is ava...

Page 8: ...correct method of draining is not followed In certain circumstances and at the dis cretion of the installer install a WRAS ap proved automatic air vent on the hot water outlet at the highest point ON...

Page 9: ...a tions that have a floor standing boiler AUTO MAIN OPEN 4 Install the 2 port motorised valve at the heating coil s inlet or outlet 5 For the 2 port motorised valve follow the installation direction t...

Page 10: ...must increase the diameter of the line When installing the drain line comply with the standards directives and laws that are applicable in your country Size of the outlet valve Minimum diameter of th...

Page 11: ...f water drains onto access paths 5 2 6 Installing the temperature sensor for the immersion heater Note The temperature sensor is used to control the im mersion heater via a connection box or a control...

Page 12: ...1 SPDT relay 2 Switch for immersion heater 3 SPUR fuse 4 Immersion heater 1 Remove the cover for the electrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance...

Page 13: ...3 2 1 3 BLUE GREY GREEN ORANGE BROWN BROWN 1 Third party control 2 3 port motorised valve 2 port motorised valve 3 Heat generator Connect the assembly Condition Installation with a boiler 70 60 50 40...

Page 14: ...arts during maintenance or repair work this may void the conformity of the product and it will therefore no longer comply with the applicable standards We strongly recommend that you use original spar...

Page 15: ...ommissioning the product Switch off the heat generator Unplug the domestic hot water cylinder s mains plug Close the cold water stopcock Drain the product Page 14 Remove the hydraulic connections and...

Page 16: ...tat to 55 C 4 Replace the thermostat Irregular domestic hot water output at the valve 1 Defective expansion vessel 2 Thermal control 1 Set the expansion vessel 2 Interrupt the power supply of the prod...

Page 17: ...d pressure in the expan sion vessel 0 3 MPa 3 0 bar 0 3 MPa 3 0 bar Maximum temperature of the heating circuit 95 95 Maximum domestic hot water temperature 85 85 Heat loss 24 h energy effi ciency clas...

Page 18: ...sion heater to the power supply 230 V 50 Hz 230 V 50 Hz Immersion heater power 5 kW 7 5 kW Note Optional Low loss header 230 240 V 50Hz 230 240 V 50Hz Thermostat 230 240 V 50Hz 230 240 V 50Hz IP ratin...

Page 19: ...Appendix 0020235300_03 uniSTOR Installation and maintenance instructions 19 D Commissioning Checklist...

Page 20: ...UROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is t...

Page 21: ...Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comme...

Page 22: ...10 Documents 5 Drain valve 9 Draining the product 14 E Electricity 3 F Filling and purging the product 14 Frost 4 H Handing over to the end user 14 I Identification plate 5 Inspection work 14 16 Insta...

Page 23: ......

Page 24: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Reviews: