4 Set-up
30
Installation instructions 0020237952_03
3.3 CE label
The CE label shows that the products
comply with the basic requirements of the
applicable directives as stated on the iden-
tification plate.
The declaration of conformity can be
viewed at the manufacturer's site.
4 Set-up
4.1 Checking the scope of delivery
▶
Check that the scope of delivery is com-
plete.
Quant-
ity
Contents
1
VAZ CPC/CPCW control
1
Operating instructions
1
Installation instructions
4.2 Installing the controller
2
1
1. Cut out an opening for the cables at
the point provided for this
(1)
in the wall
base.
Applicability:
VAZ CPCW
▶
When setting up the wireless con-
trol, ensure that the clearance to the
MASTER ventilation unit is
≤
20 m.
2. Guide the cables through the opening.
3. Hold the wall base horizontally against
the wall and mark the positions of the
drill holes through the openings
(2)
for
the screws.
4. Remove the wall base and drill the two
holes at the positions marked on the
wall.
5. Guide the cables through the opening
in the wall base.
6. Use suitable rawl plugs and flat-head
screws to secure the wall base in
place.
7. Connect the control to the electricity
supply. (
→
Page 31)
8. Fit the control onto the wall base, un-
til the latching lugs audibly click into
place.
5 Electrical installation
Only qualified electricians may carry out
the electrical installation.
Danger!
Risk of death from live con-
nections (220/230 V)!
There is a risk of death from
electric shock when working on
live connections (220/230 V).
▶
Disconnect the power supply
to the product before com-
mencing any work on it.
▶
Secure the power supply
against being switched on
again.
▶
Check that there is no
voltage in the connections.