0020152779_05 - 10/14 - Vaillant
12
START UP
b
Caution!
Risk of material damage
►
Comply with electrical cable
routing
►
Avoid any contact with hot parts
(heating coil).
►
Keep a distance of 10mm between
connecting cables and metallic
elements that are a heat source.
►
To guarantee the minimum
tension at the cables, the screwed
connections on the power supply
cable and the relay control cable
must be tightened sufficiently.
Strain relief: 100N (10kg)
1
2
3
1 Power cable (*)
2 Relay command cable
(*)
3 Temperature probe cable
(Sensor included no
mounting)
(*) Not included
i
Notes
The temperature probe must be assembled
using thermal paste for good heat transfer.
5 Start
up
►
For
fi
lling, refer to the installation instructions of the heat
pump.
►
Check the electrical and water installation.
►
Check all connections for leaks..
►
Fill the heating installation.
►
Purge your heating system.
►
Replace the power.
e
Danger!
Risk of death from electric shock!
►
Before carrying out the following
work, ensure that the product has
been disconnected from the
power supply.
5.1
Purging the appliance
1
1 Air
vent
►
Open the air vent (1), when
fi
lling the heating circuit with
water.
b
Caution!
Risk of damage in case of bad
purge!
If air purging is not done properly,
this may cause damage to the
electrical heating element.
►
Make sure the heating circuit is
properly purged air.
b
Caution!
Risk of material damage
►
When purging the air from the
resistance, avoid all risk of water
projection onto the electrical
components.
Summary of Contents for VWZ MEH 60
Page 15: ......