4. De-energizing
vNet PoE powered CAB100A model
:
Disconnect the Ethernet PoE cable from the vNet device.
5. Mount the new PDT101 transmitter on the DIN rail.
Rest the upper part of the locking mechanism on the DIN rail and push down firmly.
This will click the device into place.
6. Use the existing wires in the PDT101 wire set to connect the new PDT101.
Discard the black wire end caps before connecting the wires.
7. Fasten the wires to the wire terminal connector in the PDT101 with a small flat head
screwdriver.
• Connect the black wire in the wire set to the
COM
terminal and the red wire to the
Vin
terminal of
PDT101
• When connecting the third wire in the wire set to the
Vout
terminal, please observe the color of the wire
coming from the DL4000 data logger connector. The
PDT101 transmitters installed at the factory are
connected so that the rightmost PDT101 on the DIN rail is
connected to data logger channel 4. See the location of
the data logger connector and channel markings next to
it in
above.
CAB100 Installation Guide
M212242EN-B
34
Summary of Contents for CAB100
Page 1: ...M212242EN B Installation Guide CMS Industrial Cabinet CAB100...
Page 144: ......
Page 146: ...www vaisala com...