8. Reconnect power in
24 VDC powered CAB100A model
:
a. Reconnect the power wires in the fuse terminal blocks.
b. Switch on mains power.
9. Reconnect power in
vNet PoE powered CAB100A model
:
a. Reconnect the Ethernet PoE cable to the vNet device.
b. Switch on mains power.
More information
‣
‣
CAB100A wiring diagrams (page 121)
‣
CAB100A layout diagrams (page 130)
Chapter 5 – Adding devices to CAB100A
35
Summary of Contents for CAB100
Page 1: ...M212242EN B Installation Guide CMS Industrial Cabinet CAB100...
Page 144: ......
Page 146: ...www vaisala com...