15. Connect the power wire connector to the power block on the right-hand side of the
cabinet.
16. The new PDT101 transmitters are now mounted and connected.
1
Wires connected to PDT101 wire terminal connector
2
Data logger wires connected to data logger
3
Power wires connected to power block
17. Route the wires along the cable ducts.
18. Insert any extra length of wire into the cable ducts and replace the cable duct covers.
19. Reconnect power in the cabinet.
a. Switch on the circuit breaker.
b. Switch on mains power.
Chapter 6 – Adding devices to CAB100B
47
Summary of Contents for CAB100
Page 1: ...M212242EN B Installation Guide CMS Industrial Cabinet CAB100...
Page 144: ......
Page 146: ...www vaisala com...