For instructions on introducing PDT101 transmitters as new devices to an empty DIN rail in
the cabinet, see
Adding PDT101 transmitters as new modules to CAB100B (page 42)
The PDT Wiring Set consists of wiring for 4 devices. Any unused wires in the Wiring Set have
been placed in the cable duct at the factory. If you have, for example, 3 PDT101 transmitters
installed on a DIN rail, and want to complete the set by installing a fourth one, use the
existing PDT101 wires present in the cable duct.
1. De-energize the cabinet:
a. Switch off mains power.
b. Switch off the circuit breaker located inside the cabinet.
1
Circuit breaker
2. Disconnect the PDT101 power wire connector from the power block located on the
right-hand side of the cabinet.
3. Remove the cable duct cover below the PDT101 mounting location.
Chapter 6 – Adding devices to CAB100B
49
Summary of Contents for CAB100
Page 1: ...M212242EN B Installation Guide CMS Industrial Cabinet CAB100...
Page 144: ......
Page 146: ...www vaisala com...