16. Route the wires along the cable ducts.
1
Safety barrier wires connected
2
Safety barrier power wires connected to power block
3
Data logger wires connected
17. For wiring of the intrinsically safe screw terminals in the barriers, refer to the wiring
instructions printed on the side of the barrier and the
Operating Instructions
leaflet
provided in the barrier packaging.
18. Cut the original cable duct and its cover to the appropriate length and screw it back
into place, to the left of the partition plate.
Vaisala recommends that you label the cable duct cover with the text INTRINSICALLY
SAFE CONNECTIONS. Alternatively, use a blue cable duct as shown in
.
19. Insert any extra length of wire into the cable ducts and replace the cable duct covers.
20. Reconnect power in the cabinet.
a. Switch on the circuit breaker.
b. Switch on mains power.
For instructions on configuring measurement units and scaling in DL4000 data loggers,
see
Vaisala viewLinc Enterprise Server Version 5.0 User Guide
(M211975EN).
More information
‣
CAB100B wiring diagrams (page 126)
‣
CAB100B layout diagrams (page 135)
CAB100 Installation Guide
M212242EN-B
70
Summary of Contents for CAB100
Page 1: ...M212242EN B Installation Guide CMS Industrial Cabinet CAB100...
Page 144: ......
Page 146: ...www vaisala com...