Valcom, Inc.
5614 Hollins Road
Roanoke, VA 24019
540-563-2000 P.
540-362-9800 F.
www.valcom.com
11
Installation Instructions
Plastic Double Mount Installation
t
Snap and screw base to metal mounting bracket -
Snap the base to the metal mounting bracket by first making contact
with the lip in the upper side of the base and the metal mounting bracket. When the base has been snapped onto the bracket, take
the two (2) 6-32 x 1/2” pan head screws that orginally came installed on the base and screw them back into the two holes on the
underside of the base to secure the base to the metal mounting bracket.
y
Connect switch box wires to clock harness -
Take the wiring harness supplied with the clock and make all necessary
connections between the wiring harness and the switch box wires using wire nuts. Perform this task for both clocks. If using IP
clocks, wiring will not be supplied with the clocks - the installer will be responsible for supplying all Ethernet wiring.
u
Plug and secure wiring -
Loosen and slip excess wiring through provided wire clamp (comes attached to each housing) and
tighten the clamp. After securing excess wiring, plug the jack at the end of the wiring harness into the appropriate jack on the back
of the display board. Perform this task for both clocks.
i
Mount display board to housing -
Using the four (4) self tapping, 6-19 x 1/2" flat head screws supplied in the assembly kit,
take the display board and screw it to the front side of the clock housing (4 screws per clock).
o
Snap on filter -
Take the red filter bezel and snap it on to the front side of each clock housing.
a
Snap on frame -
Take the gray frame and snap it on to the front side of each clock housing.